My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:59:48 PM
Creation date
7/2/2012 11:14:13 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
6/18/2012
Expiration Date
6/14/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Nos. 10-6704, 10-6705 & 12-6763 <br />Request for Approval of Change Order No. 1 <br />June 14, 2013 <br />Page 3 of 3 <br />CHANGE ANALYSIS <br />DETAILED JUSTIFICATION <br />Seventeenth/King Streets and Civic Center Drive/Pacific Street traffic signal <br />improvements included: new traffic signals, conduit, interconnect cable, pull boxes, <br />emergency preemption system, communication equipment, both signal and bicycle traffic <br />loops and signing and striping. Due to the close proximity of the new traffic signal on 17th <br />Street/King Street with the existing traffic signal on 17th Street/English Street motorists <br />approaching one intersection that has a red light may confuse the green light from the <br />other intersection. To avoid this potential red light running issue Programmable vehicular <br />heads are needed. PV heads can be programmed to appear blank as you approach until <br />you are in close proximity to the intersection. Therefore, Traffic Engineering requested <br />replacing the traffic signal heads with programmable traffic signal heads. A prior approval <br />was granted for this work on March 21, 2013. <br />REVISED DETAILS: N/A <br />COST ANALYSIS <br />This Change Order accounts for only the agreed work not covered by contract line items. <br />Item No Description Agreed Costs <br />1 Furnish and install programmable vehicular heads $12,487.50 <br />K:\construction\projects\10-6704\CO #01\MEM RFA CCO #01
The URL can be used to link to this page
Your browser does not support the video tag.