My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-07-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
07/16/2012
>
FULL PACKET_2012-07-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2012 9:41:55 AM
Creation date
7/12/2012 6:18:12 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
7/16/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JULY 16, 2012 <br />TITLE: <br />CONTRACT AWARD FOR BROADWAY <br />REHABILITATION FROM ANAHURST <br />PLACE TO FIRST STREET WITH ALL <br />AMERICAN ASPHALT (PROJECT NOS. <br />116736 AND 116746) <br />CITY ANA ER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 1' Reading <br />? Ordinance on 2nd Reading <br />? Implementing Resolution <br />? Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to All American Asphalt, Inc., the lowest responsible bidder, in accordance <br />with unit bid prices in the estimated amount of $2,443,348 for construction of the Broadway <br />Rehabilitation from Anahurst Place to First Street. <br />2. Approve a Funding Analysis with a total estimated construction cost of $3,054,000. <br />DISCUSSION <br />The City's Pavement Management System has identified Broadway from Anahurst Place to First <br />Street (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated due to <br />weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, <br />driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require <br />replacement. Improvements include reconstruction of the pavement, replacement of damaged <br />concrete curb and gutter, driveway approaches, sidewalk, and the construction of new cross <br />gutter. Once completed, these improvements will extend the life of the pavement and enhance <br />the ride quality, surface drainage, and appearance of the street. <br />The Notice Inviting Bids was advertised on June 4 and 5, 2012, and bids were opened on June <br />20, 2012. A summary of the bid invitations mailed, the bids received, and the bid results are as <br />follows: <br />Santa Ana Contractors receiving notices: 13 <br />Contractors requesting bidding documents: 18 <br />Bids received: 4 <br />Bids received from Santa Ana Contractors: 1 <br />23A-1
The URL can be used to link to this page
Your browser does not support the video tag.