My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (9)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:49 AM
Creation date
7/25/2012 3:23:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
7/16/2012
Destruction Year
2017
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 11 -6744 <br />Request for Approval of Change Order No. 4 <br />May 16, 2013 <br />Page 4 of 4 <br />COST ANALYSIS <br />The agreed cost of $242,212.00 includes all costs for labor, equipment and materials to: <br />bore for and install 7200 LF of 1 1/2 " conduit; terminate the conduit at each pole; place <br />new PCC foundation caps; install three new #8 wires; remove the existing incandescent <br />fixtures; install new metal halide fixtures; and make final connections in the service <br />pedestals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.