Laserfiche WebLink
CITY OF SANTA ANA <br />PROJECT NO. 1 1 -6736: BROADWAY FROM ANAHURST PL. TO EDINGER AVE. <br />PROJECT NO. 1 1 -6746: BROADWAY FROM EDINGER AVE. TO FIRST ST. <br />PROPOSAL 8c CONTRACT AGREEMENT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: I \ I 1 ��(l ��1 I 1���� -� <br />REQUIREMENT: <br />The undersigned declares that he /she has carefully examined the location of the proposed work, that <br />he /she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS, <br />and hereby proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any), specifications and special provisions, for the unit prices) or lump <br />sums) set forth in the following schedule: <br />Item # Bid Item Unit Quantity Unit Price Amount <br />1 . <br />Unclassified Excavation * <br />CY <br />4,500 <br />$ /� <br />$ � 0 7 � Sl7 — <br />2. <br />AC Pavement * <br />TN <br />12,550 <br />$ ? l � <br />$ 8% / o�jo — <br />3. <br />Pulverize Material and Cement -Treat <br />SF <br />239,700 <br />$ . 77 <br />$ � �`/ S G� <br />Base (CTB) � * <br />4. <br />Remove Excess Pulverized Material * <br />CY <br />2,380 <br />$ 23. L/o <br />$ 55 69� — <br />5. <br />Pavement Fabric <br />SY <br />43,100 <br />$ /. Sv <br />$ 6y �So — <br />6. <br />Cold Milling * <br />SF <br />] 4l ,000 <br />$ ,'3 � <br />$ 5 2 / 70 — <br />7. <br />Remove PCC Pavement * <br />CY <br />2,400 <br />$ 3Ci— <br />$ �d6 L /6o — <br />8. <br />PCC Curb and Gutter <br />LF <br />15,730 <br />$ / `/ — <br />$ 2Zo 22�j— <br />9. <br />PCC Sidewalk (4 ") <br />SF <br />12,750 <br />$ 2. io <br />$ 36 9 �s- <br />1 O. <br />PCC Cross Gutter <br />SF <br />8,700 <br />$ cS � 2 � <br />$ s 3 9 yu — <br />1 1 . <br />PCC Driveway Approach (T = 6 ") <br />SF <br />26,400 <br />$ � . % U <br />$ / D 2 i �o — <br />12. <br />PCC Driveway Approach (T — 8 ") <br />SF <br />700 <br />$ 1 2 — <br />$ � `> U u — <br />4.Sv <br />13. <br />PCC Curb Ramp <br />SF <br />14,700 <br />$ '� --{LQ <br />$ 66 /�d <br />TO BE INCLUDED IN BID PACKAGE <br />BP 1 of 15 <br />