My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 3:59:33 PM
Creation date
7/30/2012 9:50:17 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA)
Contract #
A-2011-265
Agency
PUBLIC WORKS
Council Approval Date
12/19/2011
Expiration Date
9/30/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT C -1 -3022 <br />MacArthur Boulevard/Talbert Avenue <br />ATTACHMENT A <br />PARTICIPATING AGENCIES to indentify improvements in metrics from the Before to After <br />conditions. The Before and After Study shall constitute the PROJECT Final Report. <br />Additionally, this report shall document improvements accomplished and recommend <br />procedures for continuing maintenance, surveillance, and evaluation of the coordinated <br />signal system. <br />4. Engineering Design Review and Procurement/Construction — Support Infrastructure <br />Each AGENCY shall provide sufficient staffing to provide Engineering Design Review of <br />Consultant provided design documentation. If design documentation is provided by the <br />AGENCY for PROJECT, the Engineering Design Review requirement shall be satisfied. <br />Purchase and construction /installation of the requested traffic signal infrastructure and <br />upgrades, software, licenses, or other components as approved in the application shall be <br />by the AUTHORITY in the name of and for the end user AGENCY. The AUTHORITY shall <br />work with the PARTICIPATING AGENCIES to coordinate design, identification of applicable <br />standards/specifications, purchasing and /or installation of the required improvements. <br />Design and other technical support to implement the upgrades shall be subject to the <br />designated cost estimate. The budget for these improvements is fixed to the approved <br />budget and will be subject to revised scope or additional contributions. The highest priority <br />improvements shall be those that are required to optimize signal timing. The AGENCY shall <br />waive all fees for permits and inspections and shall provide sufficient professional staffing to <br />provide construction support and inspection services to PROJECT. <br />PROJECT TRAFFIC SIGNAL SYNCHRONIZATION — ON GOING MAINTENANCE AND <br />MONITORING <br />The following is a summary of the on -going maintenance and monitoring for PROJECT: <br />1) Continued Signal Timing Support <br />From the date of completion and acceptance of the signal timing implementation by the <br />AGENCIES, the AUTHORITY shall provide regularly scheduled monthly signal timing <br />support to monitor, observe, fine -tune and optimize the signal timing and phasing <br />operation, PROJECT wide. The AUTHORITY shall provide a reporting mechanism to <br />the AGENCIES documenting any changes made or recommended including <br />maintenance issues regarding systems components directly related to the Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.