My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 3:59:33 PM
Creation date
7/30/2012 9:50:17 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (FOUNTAIN VALLEY, HUNTINGTON BEACH, SANTA ANA)
Contract #
A-2011-265
Agency
PUBLIC WORKS
Council Approval Date
12/19/2011
Expiration Date
9/30/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT C -1 -3022 <br />MacArthur Boulevard /Talbert Avenue <br />ATTACHMENT A <br />• Local agency timing preferences or policies for all modes of travel and special <br />intersection treatments <br />• Manual and Machine Traffic counts for highway links and intersections for <br />weekday and weekend time periods for all modes of travel. Special 72 -hour <br />video counts will be conducted at up to eight (8) intersections along the <br />corridor with established special modal use. <br />b) Field Reviews <br />AUTHORITY shall conduct PROJECT field reviews to verify collected data <br />including geometric layout, inventory of existing traffic signal control and <br />communications, and any and all factors that impact or affect signal <br />progressions. AUTHORITY in coordination with the PARTICIPATING <br />AGENCIES shall identify mitigations for the existing traffic signal control <br />equipment or geometric layouts to determine recommended PROJECT related <br />improvements <br />2) Signal Synchronization Timing <br />The AUTHORITY shall develop a signal synchronization model using Synchro and Sim <br />Traffic 8.0 and Tru — Traffic 9.0 to verify the operation of existing timing and then produce <br />and evaluate potential timing changes that would improve or refine the corridor traffic flows <br />through improved optimized signal operations. The PARTICIPATING AGENCIES shall be <br />involved in the review and validation of the recommended signal timing. The OCTA Corridor <br />Synchronization Performance Index (CSPI) combines Average Speed, Stops per Mile, and <br />Greens per Red (number of intersections successfully traversed on a Green Light vs. <br />Stopped by a Red Light) into a composite index. The CSPI shall be the defined metric in this <br />evaluation <br />The AUTHORITY shall utilize the approved Optimized Signal Timing and implement the <br />tim.ing into the central and field controller systems and provide Fine Tuning services. The <br />After Study Travel Time Runs Shall be performed and the Before to After comparison CSPI <br />shall then be determined <br />3) Before and After Studies and Reports <br />AUTHORITY shall conduct real -time floating car "runs" in each direction during the planned <br />(Before) and implemented (After) time periods of PROJECT traffic signal synchronization. <br />Summary reports shall be prepared by AUTHORITY in coordination with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.