Laserfiche WebLink
AGREEMENT C -1 -3023 <br />PROJECT P - WARNER AVENUE - WORK BY LOCATION <br />ATTACHMENT A <br />Comments, Wishes, Needs of Huntington Beach <br />Instructions: Enter any special circumstance such as conduit, communications, central or <br />field master modifications, new systems, TMC, YIDS, etc. that are not part of the <br />intersection listing on the Main Data Sheet. Prioritize with 1 being best and 5 being worst. <br />Add items if you wish. <br />Priority <br />Description <br />Comments <br />Replace existing TWP interconnect (in existing 1.5" <br />1 <br />conduits) with new 96- strand SMFO from <br />Algonquin to Newland along Warner Ave: 21,200 <br />feet (not accounting for slack in pull boxes) <br />2 <br />Upgrade existing pull boxes for new fiber to #6E at <br />estimating approximately <br />the cabinet and #6 in between signals <br />every 600 feet <br />Communication equipment at each signal along the <br />3 <br />fiber path (13 total): <br />1) Fiber Patch Panel; 2) Ethernet Switch; 3) Splice <br />Enclosure <br />4 <br />Interconnect with City of Fountain Valley at <br />Warner /Magnolia <br />