My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:47:49 PM
Creation date
7/30/2012 10:39:30 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Contract #
A-2011-267
Agency
PUBLIC WORKS
Council Approval Date
12/19/2011
Expiration Date
9/30/2014
Destruction Year
2019
Notes
(SANTA ANA, ANAHEIM, ORANGE, PLACENTIA, TUSTIN)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT C -1 -3024 <br />Tustin Avenue /Rose Drive <br />ATTACH M ENT A <br />Project P Corridor <br />Scope of Work <br />Tustin Avenue /Rose Drive <br />INTRODUCTION <br />The Renewed Measure M (M2), Project P - Regional Traffic Signal Synchronization Program <br />(RTSSP) is a multi- agency, corridor -based approach that optimizes traffic signal timing based <br />on analysis of metrics obtained from existing traffic patterns. This approach acknowledges local <br />agency responsibility and control of signal timing and coordinates with project agencies to <br />develop acceptable synchronization timing. The PARTICPATING AGENCIES /AGENCY <br />(AGENCIES) along the Tustin Avenue /Rose Drive corridor (PROJECT) have requested, as <br />detailed in the approved application, that the Orange County Transportation Authority <br />(AUTHORITY) be designated as the LEAD AGENCY. AUTHORITY will administer the work <br />with the assistance of consulting or contractor services to provide project management, traffic <br />signal timing optimization, and implementation of approved equipment upgrades as submitted in <br />the application for PROJECT. This scope requires the active assistance by all corridor <br />AGENCIES throughout the process even without special reference to their participation. <br />PROJECT TRAFFIC SIGNAL SYNCHRONIZATION — PRIMARY IMPLEMENTATION <br />The following is an outline of the scope of services for PROJECT Primary Implementation that is <br />associated with developing and implementing optimal PROJECT time -of day traffic signal <br />coordination plans: <br />1) Project Administration <br />AUTHORITY shall provide general project administration, environmental processing, and <br />quality control. PARTICIPATING AGENCIES shall provide support project management <br />services for the project intersections located within their jurisdiction and assist in maintaining <br />PROJECT schedule. <br />a) Data Collection <br />The AUTHORITY will assemble with the assistance of PARTICIPATING <br />AGENCIES the necessary data to understand the existing traffic conditions for <br />the PROJECT and its respective traffic signal operations. This shall include, at <br />minimum, the following: <br />• All data, documents, plans, photos, etc. related to each Project intersection <br />within the past two years <br />
The URL can be used to link to this page
Your browser does not support the video tag.