Laserfiche WebLink
AGREEMENT C -1 -3024 <br />PROJECT P - TUSTIN AVENUE / ROSE DRIVE - WORK BY LOCATION <br />ATTACHMENT A <br />Comments, Wishes, Needs of Tustin <br />Instructions: Enter any special circumstance such as conduit, communications, central or field master <br />modifications, new systems, TMC, YIDS, etc. that are not part of the intersection listing on the Main Data <br />Sheet. Prioritize with 1 being best and 5 being worst. Add items if you wish. <br />Priority <br />Description <br />Comments <br />1 <br />Traffic signal on Tustin Ave. /First St. will require <br />additional $8,000 because this is a field master <br />The original cost of $20,000 was based on <br />the cost of replacing a local controller and <br />cabinet <br />