Laserfiche WebLink
COOPERATIVE AGREEMENT NO. C -13024 <br />1 E. To provide updated timing plans and traffic count data to the PARTICIPATING <br />2 AGENCIES. <br />3 F. To prepare a "Before and After Study' for the PROJECT. As described in the Measure <br />4 M2 Eligibility Guidelines adopted by the AUTHORITY, the "Before and After Study" for the project is <br />5 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />6 8.111.9) for the project. The AUTHORITY shall provide the "Before and After Study" to the <br />7 PARTICIPATING AGENCIES in draft and final formats for comment and comments shall be noted in <br />8 the final study. <br />9 G. To provide Ongoing Maintenance and Operation of optimized signal timing after Primary <br />10 Implementation of the PROJECT is completed and continue until the end of the three year grant period. <br />11 ARTICLE 5. RESPONIBILITES OF THE PARTICIPATING AGENCIES <br />12 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />13 and funding of the PROJECT: <br />14 A. Provide a technical representative to meet and participate as a member of the <br />15 project's Traffic Forum. <br />16 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />17 project. <br />18 C. To participate and support the PROJECT implementation within the timeframe <br />19 outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br />20 AUTHORITY. <br />21 D. To provide the AUTHORITY all current intersection, local field master, and/or central <br />22 control system timing plans and related data upon request. <br />23 E. To provide the local match and /or documentation for the in -kind services for the <br />24 project in accordance with Attachment B. Failure to provide included match and /or evidence of in- <br />25 kind service may result in the loss of future participation for competitive funds. <br />26 / <br />Page 6 of 17 <br />