Laserfiche WebLink
Assessment Formula: <br />&b Frordsge Fee + Land Arm Fee + Su Ndkig Area Fee + Parcel FM <br />1. SW4W4wty mWetalial uses are set at a rate of 10 cenla per square footd buing pad, tom awe to fax wft areset at a fiat rated X100 perunk <br />(trcbudn residlediat condos). <br />2. Mtdrl4+ernilP? n,.el wM uses of five or more w ft are set at 25 percent of respeefive base assessment rates ( ): <br />3 Nonprolk (1101 W) ownedloccupied properr ea are eel at 25 percent of respective base amt rates: <br />4. <Suiklkg area are capped at a lbor area ratio (FAR) of 4.0, <br />& led propertles wit not be assessed and twit receive no direct services, <br />6. Rasf "al trees, mgandkw of the number of units, that are 100 percent projeat4wed rentef assistance pragrarte; for exampie, senior housi ng and the <br />Re. A not be assessed and will reserve no direcx services. <br />7. Ubted-use proparWelcompkxes will generally be assessed based on prorated W%1 use ratios, using ft foR v*V guideNnea: <br />! ! if alUm(?OwMaesl <br />a. Biking area fee at full bung area fee no (stn dwW parking anal owkided). <br />b. Lend area fee at full land area fee We but prorated for each unit bared an ratio of unit but q area to inlet building area. <br />a Frontage fee at full frontage rate but prorated for each unit based an ratio of unit budding area to btal building area. <br />Mbced-U-" Wmtal: r uW, towQRmrrcercW and or ResidOPW (sing_ls owner) <br />k <br />a Building area fee at full rate for comnerctal area and 25 perch comrwercW rate for nesidwW are (structured parking area o dcrded), <br />b. Land area fee at full land are The reti& <br />a Frontage fee at full fontage rate. <br />WON)" Condos: Oreund•Rw,Comrnrrc}el anti >ibw-Soor Residlen l jmicgymeral <br />a Building area fee at ftd We farcornmerrdd pod seas and 10 cents per square foot of batting pad area, per roswieM{d undo ON (struchx)d pwk V <br />area awAxlad). <br />0. Land area fee at full land arse fee rate for commerebl pod fodprtrL <br />a Frontage fee at full frontage robe for oonarrstmb (ground floor duct frontage). <br />d. Livevock condo urns %two there is a tier and legally defined dletlrxdion between work space and 6drg space vrf 1 be awes ed using a combindon 0( <br />a, b and c above. <br />O wd Rai Fee is caiculaW by muttfptying the street feet d street frontage d a parcel by fire Shot Frontage Rate ($6 per linear foot). <br />Land Arms Fee lie c*Wsted by tnvitlplytrg the square footage of the parcel by the Land Area Rate (10 cants per square foot) <br />BWWft Area Fee Is caimgated by mu* 10v the aquae footage of a sttuc Wren as derived from ita gross entt br duns, by the Building Ares Rate <br />(15 Istria per square foot). <br />Flat Parcel Fee each individual Assessor's Parcel Is assessed the Flat P Rde (1425). <br />Stred Frontage Rate Land Ara Rats Bulldng Ara Raft Fig Parcel Rats <br />$6.00 per lkmar foot 100 per square foot 150 per square foot $425 per parcel <br />47 <br />EXHIBIT 3 <br />19E-13