My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - REWIRE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
08/06/2012
>
25B - AGMT - REWIRE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2012 11:51:43 AM
Creation date
8/2/2012 11:51:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/6/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />AUGUST 6, 2012 <br />TITLE: <br />AMENDMENT TO AGREEMENT WITH <br />MACADEE ELECTRICAL <br />CONSTRUCTION INC. <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 15t Reading <br />? Ordinance on 2"d Reading <br />? Implementing Resolution <br />? Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Authorize the City Manager and Clerk of the Council to execute the attached amendment to the <br />agreement with Macadee Electrical Construction, Inc. to rewire the street light system on <br />Broadway and Sycamore Street in the amount of $50,000 for a total contract amount not to <br />exceed $222,000, subject to nonsubstantive changes approved by the City Manager and City <br />Attorney. <br />DISCUSSION <br />On April 2, 2012 the City Council awarded a contract to Macadee Electrical Construction, Inc. to <br />rewire the Broadway and Sycamore street lighting systems. These systems are obsolete and <br />need to be updated. The intent was to use the existing conduit, remove the obsolete series-type <br />wire, and install new wires with new fixtures, ballasts, and lamps. <br />During the rewiring process, some of the underground conduit on Sycamore was found to be <br />corroded beyond repair and needs to be replaced. This amendment is needed to install new <br />conduit using the directional boring method, installing pullboxes, and replacing pavement. <br />The original agreement included the contract amount of $156,889 plus $15,111 in contingencies. <br />These contingency funds have been exhausted. This amendment increases the contingency <br />funds by $50,000 for a total amount not to exceed $222,000. <br />25B-1
The URL can be used to link to this page
Your browser does not support the video tag.