My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
08/06/2012
>
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:53:58 PM
Creation date
8/2/2012 4:11:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
8/6/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Montclair Specific Plane <br />Metrolink Station Parking Demand <br />Study <br />Los Angeles, CA <br />IBI Group prepared a parking demand analysis for the <br />proposed North Montclair Specific Plan area. The <br />specific plan calls for the development of over 1,500 <br />residential units and retail development around the <br />existing Montclair Metrolink commuter rail station. <br />The parking demand analysis quantified the parking <br />demands of the new development and recommended <br />a target number of public parking spaces that should <br />be included in the specific plan area to serve new <br />development and park- and -ride commuters at the rail <br />station. The study also included the development of <br />conceptual parking garage layouts for the relocation <br />of surface parking at the Metrolink station. This <br />assignment was completed as part of the Southern <br />California Association of Government's (SCAG) 2% <br />Growth Strategy study. <br />Anaheim Canyon Metrolink Station <br />Project Study Report <br />Anaheim, CA <br />IBI Group prepared a Project Study Report (PSR) <br />for the expansion of the Anaheim Canyon Metrolink <br />Station. A primary element of the PSR is the <br />preparation of a parking demand study for the <br />proposed expansion of the station. Parking demand at <br />the station is currently exceeding available supply and <br />the spill -over parking demand is impacting an adjacent <br />office development. The parking demand study <br />identifies the potential future demand for parking at the <br />station and identifies potential alternatives to provide <br />sufficient parking for each project phase, during <br />construction, and at project completion. <br />City of Santa Ana <br />N0. 12 -043 Parking Management Plan at the Santa Ana Regional Transportation Center <br />� A I <br />ru ti: J i" 'JillL U' <br />l� f <br />LL ii, <br />f <br />�-. <br />25E -24 <br />IBI Group 6.11.12 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.