My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
08/06/2012
>
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:53:58 PM
Creation date
8/2/2012 4:11:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
8/6/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILLIAM DELO, AICP <br />Profile <br />Project Manager <br />EDUCATION <br />B.A. (Environmental Analysis and <br />Mr. Delo is an Associate of IBI Group and a Transportation Planner with over twelve years <br />Design), University of California, Irvine, <br />of experience in transportation planning and traffic engineering. Mr. Delo is an experienced <br />2000 <br />project manager, responsible for the successful completion of numerous projects ranging <br />from traffic and parking studies to regional multi -modal transportation studies. His career <br />EXPERIENCE <br />experience has included extensive participation in public and agency outreach activities. <br />2001- to date <br />IBI Group, Irvine, CA, Transportation <br />Representative Experience <br />Planner/ Associate <br />Metrolink Station Parking Management Strategies Study (2009 -2011) — Mr. Delo was <br />2000 -2001 <br />the Project Manager of this study, which identified candidate parking management <br />Civic Solutions, Inc. (City of Santa <br />strategies for the 11 Metrolink commuter rail stations in Orange County. The project <br />Monica, City of Ontario, City of Rancho <br />included coordination with the 11 station cities in Orange County, as well as the preparation <br />Santa Margarita), Assistant Planner <br />of case studies, examining the application and success of parking management strategies <br />1999 -2000 <br />implemented at commuter rail stations throughout North America. Candidate strategies <br />include pricing p arkin g, improving mode of access options, technolo gy, and parking <br />Orange County Transportation <br />Authority, Orange, CA, Assistant <br />management districts. The objective of the study was to identify a "toolkit" of potential <br />Transportation Analyst <br />strategies tailored to the existing and future environment at each station. <br />MEMBERSHIPS <br />Metro Gold Line Foothill Extension Bus Interface and Parking Garages (2009 -2011) — <br />American Planning Association <br />Mr. Delo managed IBI Group's efforts as a subconsultant on this project. IBI was <br />responsible for the identification of possible refinements to bus operations and the <br />REGISTRATION <br />development of conceptual designs for six park- and -ride facilities that will serve the <br />proposed light rail stations along this extension of the Metro Gold Line. Conceptual <br />Certified Planner, American Institute of <br />designs were developed for five parking garages ranging in size from 250 to 350 parking <br />Certified Planners #019993 <br />spaces, as well as a 125 -space surface parking lot. The project includes close coordination <br />with staff from the five cities along the corridor. <br />Anaheim Canyon Metrolink Station Project Study Report (2009) — Mr. Delo led the <br />preparation of a parking demand study for the proposed expansion of the Anaheim Canyon <br />Metrolink station. Parking demand at the station exceeds available supply and the spill- <br />over parking demand impacts an adjacent office development. As the station is improved <br />and commuter rail service is expanded, parking demand is forecast to further increase. The <br />parking demand study identified the potential future demand for parking at the station and <br />potential alternatives to provide sufficient parking for each project phase, during <br />construction, and at project completion. <br />Santa Ana Regional Transportation Center Master Plan (2010) — On behalf of the City of <br />Santa Ana, IBI Group is developing a station master plan for the Santa Ana Regional <br />Transportation Center. Mr. Delo is leading the parking demand analysis effort for this study, <br />quantifying future parking demand for the station and identifying strategies for either <br />accommodating this demand with additional parking or developing parking management <br />strategies to help reduce future demand. <br />North Montclair Parking Demand Analysis (2006) — This specific plan calls for the <br />development of over 1,500 residential units and retail development around the existing <br />Montclair Metrolink commuter rail station. Mr. Delo prepared a parking demand analysis to <br />quantify the parking demands of the new development and recommend the number of <br />public parking spaces that should be included in the specific plan area to serve new <br />development and park- and -ride commuters at the rail station. <br />IBI <br />CROUP <br />www.ieitrorp.rnn <br />City of Santa Ana <br />N0.12 -043 Parking Management Plan at the Santa Ana Regional Transportation Center IBI Group 6.11.12 9 <br />25E -28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.