My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-08-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
08/06/2012
>
FULL PACKET_2012-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:52:48 PM
Creation date
8/2/2012 4:22:14 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
8/6/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MACADEE ELECTRICAL CONSTRUCTION <br />4755 LANIER RD - CHINO, CA 91709 <br />(909) 627 -1336 - (909) 627 -3772 FAX <br />CONTRACTOR'S LICENSE #583125 (C -10) <br />QUOTATION <br />No. <br />DESCRIPTION <br />UNIT <br />QTY <br />PRICE <br />AMOUNT <br />1 <br />INSTALL 1" SCH 80 PVC VIA DIRECTIONAL BORING <br />LF <br />3000 <br />$10.75 <br />$32,250.00 <br />2 <br />INSTALL #5 PULLBOXES <br />EA <br />3 <br />$190.00 <br />$570.00 <br />3 <br />REMOVE /REPLACE CONCRETE SIDEWALK <br />SQFT <br />200 <br />$7.00 <br />$1,400.00 <br />INCLUDES LABOR (PREVAILING WAGE), EQUIPMENT, MATERIALS, <br />AND TRAFFIC CONTROL TO INSTALL (1) 1" SCH 80 PVC CONDUIT, <br />(3) #5 PULL BOXES AND REMOVE REPLACE APPROX 200 SQFT OF <br />SIDEWALK. <br />I <br />#34,220.00 <br />MACADEE ELECTRICAL CONSTRUCTION <br />KEVIN MCCARTHY <br />SANTA ANA <br />SYCAMORE CIRCUIT CONDUIT <br />07/03/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.