My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST COMPOSITES, INC. 2-2012
Clerk
>
Contracts / Agreements
>
C
>
COAST COMPOSITES, INC. 2-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:35:39 AM
Creation date
8/10/2012 9:25:31 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST COMPOSITES, INC.
Contract #
N-2012-098
Agency
COMMUNITY DEVELOPMENT
Expiration Date
12/31/2012
Insurance Exp Date
3/31/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELEMENTS OF TRAINING HOURS OF TRAINING <br />1. Will be trained to perform numerous assembly duties involving 2Op <br />advanced composites such as Carbon Fiber, Kevlar, and complex <br />adhesive systems. <br />Measurement Method: Q 8c A, task observation and inspection. Goal is to achieve rate <br />of proficiency within first Month and a half of training. <br />z. Will be trained to Fabricate composite molds and parts as per <br />instructions/drawings. 200 <br />Measurement Method: Q 8c A, task observation and inspection. Goal is to achieve rate <br />of proficiency within subsequent three and a half months. <br />3. Trained to process Lay-up dry fabric and prepreg, demold, vacuum <br />bag, and infuse composite parts as per instructions/drawings. Will 180 <br />also be trained in the following: <br />• Polish, deburr, and grind composites parts as per <br />instructions/drawings. <br />• Drill, ream, and countersink. <br />• Assemble parts/components/sub-assemblies. <br />Measurement Method: Q 8c A task observation and inspection. Goal is to achieve rate of <br />proficiency within subsequent three and a half months. <br />4. Will be trained on the outlined required quality standards. <br />Standard Operating Procedures and will learn to manage the 114 <br />equipment maintenance per specified job. <br />Measurement Method: Q 8c A task observation and inspection. Goal is to achieve rate of <br />proficiency within subsequent three and a half months. <br />RATING LEVELS: <br />Measurement method: how will it be determined if OJT participant acquired the skill? QBLA, observation, <br />product review/inspection, etc. <br />PROFICIENT MODERATE MARGINAL
The URL can be used to link to this page
Your browser does not support the video tag.