My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - CONSOLIDATED ANNUAL PERFORMANCE AND EVALUATION RPT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
19C - CONSOLIDATED ANNUAL PERFORMANCE AND EVALUATION RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2012 10:14:15 AM
Creation date
8/30/2012 10:13:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
19C
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. HUD APPROVED NEIGHBORHOOD REVITALIZATION STRATEGIES OR EZ/EC ANNUAL PROGRESS REPORT <br />In January 1999, HUD designated the City of Santa Ana as a Federal Urban Empowerment Zone <br />(FEZ). The mission of the Santa Ana Empowerment Corporation (SAEC) is to build a sustainable <br />community that fosters economic opportunities for all Empowerment Zone residents and <br />businesses. During the first three-years of designation, the SAEC's mission was supported by the <br />key elements outlined in its implementation plans. These elements include education, job training, <br />job placement, business development, safety, childcare, health, transportation, housing, youth <br />recreation, and arts/culture. Collectively, these strategies played a vital role in furthering the <br />mission of the FEZ program within Santa Ana. In early 2009, the City was notified by HUD that the <br />Empowerment Zone Program would end in December 2009, therefore no additional FEZ funding <br />would be provided. During the 2009-2010 report period the City initiated the steps necessary to <br />close the program; the City's FEZ program permanently ceased operations in August 2010. <br />D. SECTION 108 LOAN GUARANTEE <br />The City does not have an open Section 108 Loan nor did it apply for a 108 Loan Guarantee during <br />the report period. <br />08/23/2012 41 <br />19C-49
The URL can be used to link to this page
Your browser does not support the video tag.