My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 1901 NORTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
31B - CUP - 1901 NORTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:46:24 PM
Creation date
8/30/2012 12:38:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />Mitigation Measure AQ -3: During construction, architectural coating material shall be Super - <br />Compliant Low VOC paint that meets "super - compliant" VOC standard of <10 g/L of the South Coast <br />Air Quality Management District (Rule 1113). These requirements shall be specified in the final <br />architectural plans to be approved by the City of Santa Ana Planning and Building Agency prior to <br />issuance of building permits. <br />Operational Impacts <br />Regional air pollutant emissions associated with project operations would be generated by the <br />consumption of electricity and natural gas and by the operation of on -road vehicles. Pollutant <br />emissions associated with energy demand (i.e., electricity generation and natural gas consumption) <br />are classified by SCAQMD as area source emissions. <br />Mobile- and area - source emissions were calculated using the CalEEMod emissions inventory model, <br />which multiplies an estimate of daily VMT by applicable EMFAC2007 emissions factors.' The <br />CaIEEMod model output and worksheets for calculating regional operational daily emissions are <br />provided in Appendix A. As shown in Table 3 -7, regional emissions resulting from the operation of <br />Phase I on its own, along with the fully completed project (Phase I and Phase 11 together) would not <br />exceed regional SCAQMD thresholds for CO, NOx, PM10, ROC, SOx, or PM2.5. Thus, operation of the <br />proposed project would not exceed regional SCAQMD thresholds, and regional operations emissions <br />would result in a less - than - significant long -term regional air quality impact. No mitigation measures <br />are necessary. <br />Table 3 -7. Estimate of Regional Operational Emissions (pounds per day) <br />Regional Operational Emissions <br />ROG <br />NOx <br />CO <br />sox <br />PM10 <br />PM2.5 <br />Phase <br />On -site Area Source a <br />4 <br /><1 <br />4 <br /><1 <br /><1 <br /><1 <br />Off -site Electricity Sources <br /><1 <br /><1 <br /><1 <br /><1 <br /><1 <br /><1 <br />On Road Mobile Sources <br />5 <br />10 <br />56 <br /><1 <br />12 <br />1 <br />Total Phase 1 <br />10 <br />11 <br />60 <br /><1 <br />12 <br />1 <br />SCAQMD Daily Significance Threshold <br />55 <br />55 <br />550 <br />150 <br />150 <br />55 <br />Exceed SignificantThreshold? <br />No <br />No <br />No <br />No <br />No <br />No <br />Phase I and 1I <br />On -site Area Source a <br />5 <br /><1 <br />4 <br /><1 <br />0 <br />0 <br />Off -site Electricity sources <br /><1 <br />1 <br /><1 <br /><1 <br /><1 <br /><1 <br />On Road Mobile Sources <br />8 <br />14 <br />77 <br /><1 <br />16 <br />1 <br />Total Project (Phase I and 11) <br />13 <br />is <br />81 <br /><1 <br />16 <br />1 <br />SCAQMD Daily Significance Threshold <br />55 <br />55 <br />550 <br />150 <br />150 <br />55 <br />Exceed Significant Threshold? <br />No <br />No <br />No <br />No <br />No <br />No <br />Notes: <br />a Area sources include landscape equipment emissions <br />and miscellaneous sources (e.g., <br />detergents and cleaning compounds). <br />Source: ICF 2012. <br />' Daily VMT estimate derived by applying CalEEMod default trip length estimates (per land use) to the proposed <br />project default trip generation estimates (per land use). <br />The Academy Charter High School 3 24 June 2012 <br />Initial Study /Mitigated Negative Declaration ICF 00414.11 <br />III <br />
The URL can be used to link to this page
Your browser does not support the video tag.