Laserfiche WebLink
City of Santa Ana <br />Environmental Checklist <br />Under both Phase I and Phase 11, the signalized intersections would continue to operate at LOS D or <br />better during the AM and PM peak hour, with exception of the intersection of Fairview Street at 17th <br />Street /Westminster Avenue, which currently operates at an unacceptable LOS E in the PM peak <br />hour. The addition of project traffic at this intersection would result in an increase in V/C during the <br />PM peak hour by 0.004 and 0.006 under Phase I and Phase II conditions, respectively. Because the <br />City considers an impact to be significant if an intersection currently operating at LOS E or F and <br />would experience an increase in V/C of 0.010 or greater, impacts associated with an increase of <br />0.004 and 0.006 V/C at the intersection of Fairview Street at 17th Street /Westminster Avenue under <br />Phase I and Phase 11, respectively, would be less than significant. As such, impacts related to <br />operation of the proposed project (existing plus project conditions during Phase I and Phase 11) <br />would be less than significant and no mitigation is required. <br />The Academy Charter High School 3-94 June 2012 <br />Initial Study /Mitigated Negative Declaration ICF0091411 <br />31 B -172 <br />