City of Santa Ana Project Description <br />Proposed Project <br />Description of the Proposed Project <br />The proposed project includes the development of eight buildings on the 7.2 -acre project site, <br />consisting of three residential buildings, two educational buildings, a gymnasium, an <br />administrative /library building, and an administrative support building. At buildout, the project <br />would support the enrollment of 450 students, including 80 students that would reside on the <br />project site. As shown on Figure 2 -5, the eight proposed buildings would be located throughout the <br />property and would be surrounded by existing development. The project's components would be <br />developed in two phases, which are listed and summarized below in Table 2 -1. <br />Table 2 -1. Summary of Proposed Project <br />Phase I of the proposed project (shown in Figure 2 -5) would include the construction of six <br />buildings — Buildings A, B, C, D, E, and G— totaling 110,517 square feet. Phase II would consist of the <br />gymnasium (Building F) and one classroom building (Buildings H) totaling 35,619 square feet, and <br />completing the total project buildout of 146,136 square feet. The timing of Phase Ii has not yet been <br />determined, but estimated to be 5 years after the opening of Phase I, and is used as the assumption <br />for the analysis in this document. <br />All of the project buildings would range from one to three stories and would be between 25' and 55' <br />in height. The project includes 146 parking stalls that would be constructed during Phase I and <br />would be distributed around the perimeter of the site. Vehicular ingress to the project site would be <br />provided from North Fairview Street at the south end of the site. Student drop -off areas would <br />follow the perimeter of the site to egress onto North Fairview Street at the north end of the site. <br />1 ne Acaoerny Charter High School June 2012 <br />Initial5tudy /Mtitigated Negative Declaration 2 -3 ICF00914.11 <br />' r. • <br />Square <br />Percent <br />Building <br />Use <br />Stories /Height <br />Number <br />Feet <br />of Total <br />Phase i <br />A <br />Family Unit Building <br />3/35' <br />1 <br />17,500 <br />12/0 <br />B <br />Family Unit Building <br />3/35' <br />1 <br />17,500 <br />12% <br />C <br />Residential Administration /Support <br />1/25' <br />1 <br />3,200 <br />2% <br />Building <br />D <br />Family Unit Building <br />2/25' <br />1 <br />11,664 <br />8% <br />E <br />Administration, Classroom, Assembly <br />2/35' <br />1 <br />30,332 <br />21% <br />Building <br />G <br />Classroom <br />3/55' <br />1 <br />30,321 <br />21% <br />Phase 1 Subtotal <br />5 <br />110,517 <br />76% <br />Phase <br />F <br />Gymnasium <br />2/35' <br />1 <br />21,660 <br />14% <br />H <br />Classrooms <br />2/35' <br />1 <br />13,959 <br />10% <br />Phase 11 Subtotal <br />2 <br />35,619 <br />24% <br />TOTALS <br />146,136 <br />100% <br />Phase I would also include the construction of general site improvements, including <br />parking facilities. <br />Phase I of the proposed project (shown in Figure 2 -5) would include the construction of six <br />buildings — Buildings A, B, C, D, E, and G— totaling 110,517 square feet. Phase II would consist of the <br />gymnasium (Building F) and one classroom building (Buildings H) totaling 35,619 square feet, and <br />completing the total project buildout of 146,136 square feet. The timing of Phase Ii has not yet been <br />determined, but estimated to be 5 years after the opening of Phase I, and is used as the assumption <br />for the analysis in this document. <br />All of the project buildings would range from one to three stories and would be between 25' and 55' <br />in height. The project includes 146 parking stalls that would be constructed during Phase I and <br />would be distributed around the perimeter of the site. Vehicular ingress to the project site would be <br />provided from North Fairview Street at the south end of the site. Student drop -off areas would <br />follow the perimeter of the site to egress onto North Fairview Street at the north end of the site. <br />1 ne Acaoerny Charter High School June 2012 <br />Initial5tudy /Mtitigated Negative Declaration 2 -3 ICF00914.11 <br />' r. • <br />