Laserfiche WebLink
http://www.wdol.gov/wdol/scafi les/davi sbacon/CA35.dvb?v=9 <br />BRICKLAYER; MARBLE SETTER ........ $ 35.26 12.26 <br />*The wage scale for prevailing wage projects performed in <br />Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine <br />Palms, Needles and 1-15 corridor (Barstow to the Nevada <br />State Line) will be Three Dollars ($3.00) above the <br />standard San Bernardino/Riverside County hourly wage rate <br />---------------------------------------------------------------- <br />BRCA0018-004 06/01/2012 <br />Rates Fringes <br />MARBLE FINISHER .................. $ 27.04 10.66 <br />TILE FINISHER .................... $ 22.37 9.19 <br />TILE LAYER ....................... <br />-------------------------- $ 33.55 13.55 <br />------- <br />BRCA0018-010 09/01/2009 - ---------- -------------------- <br /> Rates Fringes <br />TERRAZZO FINISHER ................ $ 26.59 9.62 <br />TERRAZZO WORKER/SETTER ........... <br />----------------------------- $ 33.63 10.46 <br />---- <br />CARP0409-001 07/01/2010 - ----------- ------------------- <br /> Rates Fringes <br />CARPENTER <br />(1) Carpenter, Cabinet <br />Installer, Insulation <br />Installer, Hardwood Floor <br />Worker and acoustical <br />installer, and solar panels. $ 37.35 11.08 <br />(2) Millwright .............. $ 37.85 11.08 <br />(3) Piledriver/Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................ $ 37.48 10.58 <br />(3) Piledrivermen/Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................ $ 37.48 11.08 <br />(4) Pneumatic Nailer, <br />Power Stapler ............... $ 37.60 11.08 <br />(5) Sawfiler ............... $ 37.44 11.08 <br />(6) Scaffold Builder ....... $ 28.55 11.08 <br />(7) Table Power Saw <br />Operator .................... $ 37.45 11.08 <br />FOOTNOTE: Work of forming in the construction of open cut <br />sewers or storm drains, on operations in which horizontal <br />lagging is used in conjunction with steel H-Beams driven or <br />placed in pre- drilled holes, for that portion of a lagged <br />trench against which concrete is poured, namely, as a <br />substitute for back forms (which work is performed by <br />piledrivers): $0.13 per hour additional. Certified Welder <br />- $1.00 per hour premium. <br />CARP0409-005 07/01/2010 <br />2 of 23 25H-25 8/28/2012 10:39 AM