Laserfiche WebLink
http://www.wdol.gov/wdol/scafi les/davi sbacon/CA3 5.dvb?v=9 <br />GROUP 3: A-frame or winch truck operator; Ross carrier <br />operator (jobsite) <br />GROUP 4: Bridge-type unloader and turntable operator; <br />Helicopter hoist operator <br />GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western <br />or similar type); Tugger hoist operator (1 drum) <br />GROUP 6: Bridge crane operator; Cretor crane operator; Hoist <br />operator (Chicago boom and similar type); Lift mobile <br />operator; Lift slab machine operator (Vagtborg and similar <br />types); Material hoist and/or manlift operator; Polar <br />gantry crane operator; Self Climbing scaffold (or similar <br />type); Shovel, backhoe, dragline, clamshell operator (over <br />3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator <br />GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, <br />clamshell operator (over 5 cu. yds. mrc); Tower crane <br />repair; Tugger hoist operator (3 drum) <br />GROUP 8: Crane operator (up to and including 25 ton <br />capacity); Crawler transporter operator; Derrick barge <br />operator (up to and including 25 ton capacity); Hoist <br />operator, stiff legs, Guy derrick or similar type (up to <br />and including 25 ton capacity); Shovel, backhoe, dragline, <br />clamshell operator (over 7 cu. yds., M.R.C.) <br />GROUP 9: Crane operator (over 25 tons and up to and including <br />50 tons mrc); Derrick barge operator (over 25 tons up to <br />and including 50 tons mrc); Highline cableway operator; <br />Hoist operator, stiff legs, Guy derrick or similar type <br />(over 25 tons up to and including 50 tons mrc); K-crane <br />operator; Polar crane operator; Self erecting tower crane <br />operator maximum lifting capacity ten tons <br />GROUP 10: Crane operator (over 50 tons and up to and <br />including 100 tons mrc); Derrick barge operator (over 50 <br />tons up to and including 100 tons mrc); Hoist operator, <br />stiff legs, Guy derrick or similar type (over 50 tons up to <br />and including 100 tons mrc), Mobile tower crane operator <br />(over 50 tons, up to and including 100 tons M.R.C.); Tower <br />crane operator and tower gantry <br />GROUP 11: Crane operator (over 100 tons and up to and <br />including 200 tons mrc); Derrick barge operator (over 100 <br />tons up to and including 200 tons mrc); Hoist operator, <br />stiff legs, Guy derrick or similar type (over 100 tons up <br />to and including 200 tons mrc); Mobile tower crane operator <br />(over 100 tons up to and including 200 tons mrc) <br />GROUP 12: Crane operator (over 200 tons up to and including <br />300 tons mrc); Derrick barge operator (over 200 tons up to <br />and including 300 tons mrc); Hoist operator, stiff legs, <br />Guy derrick or similar type (over 200 tons, up to and <br />including 300 tons mrc); Mobile tower crane operator (over <br />200 tons, up to and including 300 tons mrc) <br />GROUP 13: Crane operator (over 300 tons); Derrick barge <br />operator (over 300 tons); Helicopter pilot; Hoist operator, <br />stiff legs, Guy derrick or similar type (over 300 tons); <br />Mobile tower crane operator (over 300 tons) <br />TUNNEL CLASSIFICATIONS <br />11 of 23 25H-34 8/28/2012 10:39 AM