My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARKING STRUCTURE OPERATOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/17/2012
>
19C - RFP - PARKING STRUCTURE OPERATOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 11:51:03 AM
Creation date
9/13/2012 2:21:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
19C
Date
9/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Have a High School Diploma or its equivalent; <br />e. Be well groomed at all times. <br />f. Have a minimum of eight (8) hours of basic customer service training including, <br />but not limited to, conflict resolution, handling difficult customers and cultural <br />diversity; and <br />4. The contractor must provide a supervisor during daytime working hours to supervise <br />all contractor employees on duty. The supervisor shall have substantial expertise <br />and experience in parking management and operation services. The supervisor <br />shall be the primary contact between the city and contra or on matters relating to <br />the operations and management services provided thro"is RFP. <br />to the City and shall <br />Respond to all complaints and pro% <br />complaint and the resolution or, in <br />steps being taking to resolve th <br />expected. <br />Contact the City designee at I <br />operational assignments and receive <br />Ensure that contractor onnel per <br />Prepare and submit rogr4 <br />required by the city desi e. <br />The contractor <br />shall have the <br />managemeA <br />Lvel supervisor. This person <br />a member of the contractor's <br />;tor on policy matters. <br />I uniforms for contract personnel assigned <br />kons shall include a photograph or diagram and written <br />niforms for male and female personnel and include <br />s length (short or long), shoe type, the color of shirts, <br />id other relative information. As an option, the contractor <br />ployee to wear shorts of the same color as the uniform pants <br />r months. <br />Th y Development Agency Director or his designee shall review and <br />appr niforms and insignias. <br />Uniform shall be properly fit with no rips or tears and must be clean and pressed <br />at all times to present a neat appearance. <br />9. If the Contractor finds it necessary to utilize substitute personnel, they are to be <br />equal in qualifications and training to regular personnel. <br />6 <br />R City's desil <br />rent an investig? <br />nt and the date <br />with a copy of the <br />OLSOlution required, the <br />can be <br />Fr day to discus's and clarify <br />instructions; <br />ies required by the RFP; and <br />and status reports as may be <br />19C-8 <br />5. The Supervisor shall be the primary daily operat' nt <br />also do the following:
The URL can be used to link to this page
Your browser does not support the video tag.