Laserfiche WebLink
inspections not conforming to the applicable requirements shall be corrected by the <br />Contractor and the City shall have the right to withhold payment to the Contractor until the <br />work is corrected. <br />G. SPECIFICATIONS <br />This scope of services is intended to cover all labor, material and standards of <br />workmanship to be employed for in this work plan or reasonably implied by terms of <br />same. Work or materials of a minor nature which may not be specifically mentioned, but <br />which may be reasonably assumed as necessary for the co letion of this work, shall <br />be performed by the Contractor as if described in the specifiLns. <br />LOGS / NOTIFICATIONS / REQUIRED REPORTI <br />The Contractor shall log all equipment se <br />The Contractor shall log on a daily b r <br />regarding parking facilities in a co s a <br />corrective action taken as a result <br />The Contractor shall note any hazardo <br />facilities and shall report t e conditions <br />by telephone and folI owed �othly repo <br />The Contractor will track andl <br />all parking facilities included in <br />handle all com <br />vofmsional r <br />the public <br />ell as any <br />s or damage to public parking <br />fly to the Project Manager; first <br />parking utilization levels for <br />audit its books and records <br />reasonable time. <br />GS WITH CITY <br />e appR%Wf the Santa Ana Community Development <br />!ssary by the City, there shall be a minimum of one monthly <br />and the City representative to determine progress and to <br />tion. Status reports of activities performed by the <br />riting to the City on a weekly basis or as determined <br />The contraAwl make a reasonable effort to purchase equipment and materials in <br />the City of San Ana and to utilize Santa Ana vendors. Such efforts shall be provided to <br />the City. The City shall have the ability to provide a list of possible Santa Ana vendors to <br />the Contractor. The City has the option to purchase and provide materials. The City has <br />the option to purchase special material or the City will reimburse the Contractor for <br />purchase of special material only after authorization by the City. <br />K. LABOR RELATIONS <br />(To be provided on the final RFP.) <br />Et7 <br />19C -10 <br />