My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARDY & HARPER, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
HARDY & HARPER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:02:46 PM
Creation date
9/19/2012 1:33:42 PM
Metadata
Fields
Template:
Contracts
Company Name
HARDY & HARPER, INC.
Contract #
13-6780
Agency
Public Works
Council Approval Date
9/17/2012
Destruction Year
2017
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Project No. 13 -6780: 2012 -2013 Omnibus Concrete Replacement Contract <br />PROPOSAL 8c CONTRACT AGREEMENT <br />BID PROPOSAL, continued <br />Item # Bid Item <br />Unit <br />Quanti <br />Catch Basin Protection Bar Assembly <br />Unit Price <br />Amount <br />28. <br />Reconstruct Reinforced PCC Catch <br />EA <br />2 <br />$ <br />� � �5C3 (� <br />$ <br />tc' Ot3' <br />wBolts —Non Traffic (Clear Opening <br />Basin Top Slab (W =7') <br />22 ") <br />39. Furnish and Install Cast Iron Junction EA <br />2 $ �, `-JpO <br />29. <br />Reconstruct Reinforced PCC Catch <br />EA <br />2 <br />$ <br />�!__LC <br />$ <br />�� YU� <br />Basin Top Slab (W =14') <br />� �� <br />�i `i�'O' <br />30. <br />Reconstruct Reinforced PCC Catch <br />EA <br />2 <br />$ <br />$ <br />Basin Top Slab (W =21') <br />31. <br />Construct PCC Catch Basin Inlet and <br />EA <br />1 <br />$ <br />�I �Uh' <br />$ <br />�i ��� <br />Depression (W =7') <br />32. <br />Construct PCC Catch Basin Inlet and <br />EA <br />1 <br />$ <br />1 � �Go <br />$ <br />cT� � Oe <br />Depression (W =14') <br />33. <br />Construct PCC Catch Basin Inlet and <br />EA <br />1 <br />$ <br />r`�, OG Q <br />$ <br />�`f� O c: � <br />Depression (W =21') <br />34. <br />Furnish and Install Catch Basin <br />EA <br />2 <br />$ <br />� � � V <br />$ <br />� a C <br />Screen Insert(ARS and CPS) <br />� �� � <br />�'%c 00 <br />35. <br />Repair Catch Basin Screen <br />EA <br />2 <br />$ <br />$ <br />Insert(ARS and CPS) <br />36. <br />Furnish and Install Formed Steel <br />EA <br />1 <br />$ <br />� � L O <br />$ <br />.�_���� <br />Catch Basin Face Plate <br />37. Furnish and Install Formed Steel EA <br />1 $ � � / �Q <br />$ if % � O <br />Catch Basin Protection Bar Assembly <br />w /Anchor, Hanger and Bolts <br />38. Furnish and Install Cast Iron Catch EA <br />2 $ �i �V Q' <br />(� <br />$ /� � oU <br />Basin Manhole Cover and Frame <br />wBolts —Non Traffic (Clear Opening <br />22 ") <br />39. Furnish and Install Cast Iron Junction EA <br />2 $ �, `-JpO <br />$ /, �O 0 <br />Chamber Manhole C 8r F wBolts — <br />Traffic (Clear Opening — 23.5 ") <br />TO BE INCLUDED IN BID PACKAGE <br />BP -3 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.