Laserfiche WebLink
City of Santa Ana March 26, 2012 <br />Request for Proposals Demolition Services <br />• Being on site at the time the agency is scheduled to inspect utility termination <br />• Visually surveying existing improvements and utilities near the work site, in order to protect <br />them from damage <br />• Visually surveying the site for potential materials containing regulated/ hazardous wastes <br />• Verifying waste is properly manifested for disposal at proper facility <br />• Conducting a pre -demolition survey upon completion of abatement plan implementation to <br />identify; that the asbestos, lead, regulated and hazardous wastes have been removed as <br />per their abatement plans; verify monitoring records; verify proper manifesting of waste <br />disposal; visually verify no other hazardous materials are left in demolition area; as <br />required, verify site is secured by appropriate fencing; verify that appropriate protection <br />devices are in place, such as pedestrian protection canopy; verify appropriate signing <br />displayed (i.e. no trespassing, keep out demolition in progress, danger, etc.); verify all <br />utilities have been terminated; and erosion control measures are in place, as needed and <br />required <br />• Using a checklist to complete the pre -demolition survey <br />• Confirming with the Project Manger that the demolition area is ready for demolition <br />• Directing crews in structure demolition; improvements demolition; salvaging procedures; <br />and solid waste clearing and disposal <br />• Reviewing fieldwork daily for compliance with CTO specifications and recording findings in <br />a quality control log <br />is Notifying the Project Manager when field personnel stop work upon the discovery of <br />suspect asbestos, regulated, or hazardous waste <br />• Leave the work site in a clean and neat condition, upon completion of the CTO <br />J&G Industries Page 30 <br />