Laserfiche WebLink
Work Plan <br />Approach to completing task <br />United has vast experience in deploying personnel and equipment within one hour response and <br />understands how crucial it is to respond in a timely manner. United has over 64 technicians, 10 <br />supervisors along with 12 vacuum trucks, 11 vactor trucks, roll offs and end dumps that will be <br />available If needed. Our personnel will quickly respond to various points and try to locate the <br />source of any spill or discharge into the storm drain system and will try to isolate from entering <br />into waterways. <br />United Storm Water is comprised of a team of dedicated individuals who are highly experienced in <br />storm drain maintenance, fabrication and installation of catch basin inserts, AIRS units, CPS units, <br />and working with government entities. Many of our employees have worked with our firm for over <br />10 years and along and will successfully plan, manage, and deliver professional, reliable, and <br />innovative services for this project. <br />United will provide all labor, equipment, materials necessary to perform both scheduled and as- <br />needed inspection or cleaning of catch basins inserts according to IFB. United has capability of <br />making any necessary repairs to the ARS or CPS units in place. United will also respond to any <br />emergency calls. All catch basins are inspected monthly during the storm season and cleaned as <br />needed. Catch Basins are inspected after each major storm event and cleaned as needed.The <br />work will also include as- needed "No Dumping" stenciling and the unlocking and locking of <br />automatic retractable screen covers before and after the rain season. <br />The work will be performed on all city own catch basins and be able to responding within one hour <br />in case of an emergency as described in the scope of work of the IFB. An additional inserted <br />catch basins may be added to this Contract at the sole discretion of the City. <br />