My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (3) - 2012
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF (3) - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2012 5:30:42 PM
Creation date
9/25/2012 5:08:44 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2012-135
Agency
PUBLIC WORKS
Council Approval Date
6/18/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement D12-030 <br />2. Initial Sampling and Water Quality Analyses in Low Flows <br />A minimum of one grab sample will be collected at each candidate diversion location <br />along with flow measurements. Laboratory testing will be conducted for selenium, total <br />dissolved solids, and nitrate in the water samples using protocols previously used for the <br />Nitrogen and Selenium Management Program. <br />Deliverables: <br />• Laboratory test results and flow measurements <br />Existing Utility Research <br />A preliminary utility search will be conducted at each candidate diversion location. It is <br />assumed all general utility information will be obtained from the City of Santa Ana. <br />Utilities of interest include: <br />• Sanitary sewer <br />• Local storm drain facilities <br />• Existing potable/reclaimed water pipelines <br />• Natural gas pipelines <br />• Petroleum pipelines <br />• Electrical service <br />Deliverables: <br />• Incorporate Existing Utility Research into Conceptual Site Layout <br />4. Develop Preliminary Diversion Sizing Requirements <br />Preliminary sizing of the candidate diversion locations will include the following: <br />• Establish flow rates and identify gross solids removal requirements <br />• Establish volumetric requirements for a wet-well storage basin <br />• Establish general flow and conveyance requirements <br />• Establish pumping requirements assuming an eight-hour runtime <br />A general listing of equipment requirements and associated sizing will be provided. <br />Deliverables <br />• Incorporate Preliminary Diversion Sizing Requirements into Conceptual Site <br />Layout and Conceptual Design Report <br />Conceptual Site Layout <br />Conceptual site layouts will be developed for each of the candidate diversion locations. <br />The conceptual site layouts will include the following: <br />• Identify site constraints for each candidate diversion location <br />• Site configurations for the proposed channel diversion structures
The URL can be used to link to this page
Your browser does not support the video tag.