My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF (3)-2012
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF (3)-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2013 5:20:35 PM
Creation date
9/26/2012 9:42:09 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, CITY OF
Contract #
A-2012-149
Agency
PUBLIC WORKS
Council Approval Date
7/2/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Fee Schedule <br />Part 1-Signal Coordination, Assessments, <br />Modeling, Before and After Studies, Reports <br />And Documents for OCTA reporting <br />Part 2--Work for Costa Mesa Intersections <br />Part 3-Work for Santa Ana Intersections <br />Lump Sum $ 159,609 <br />Lump Sum $ 262,525 <br />Lump Sum $ 162,215 <br />Part 4=Preparation of Record drawings, or Project Plans Lump Sum $ 29,989 <br />Specifications and Estimate or Procurement documents <br />Part 5-3 Years follow-up Maintenance Per Year $_14,700 Sub-Total $_ 44,100 <br />CUMULATIVE NOT-TO-EXCEED FEE: $ 658,438 <br />Additive Work Scope <br />Traffic Counts at Intersections Per Intersection $ 413.00 Total $12,803 <br />Install 3" Conduit <br />Per Lineal Foot $ 30.00 Total $_ 36,000 <br />Additive work shall be included exclusively at the discretion of the City contingent on bid results. <br />Please include an estimated work breakdown structure for the project and personnel rate sheet. The <br />Evaluation recognizes that costs may vary based upon project approach so work breakdown structure <br />Information should support fee submissions. <br />All originals of plans, field notes, data and calculations, correspondence, reports, electronic files, <br />etc., will be turned over to the City upon completion of work. Ten percent (30%) of the total <br />contract fee will be withheld until final project documents are submitted to the City.
The URL can be used to link to this page
Your browser does not support the video tag.