Laserfiche WebLink
1. RESOLUTION OF CONFLICTING CONDITIONS <br />Any apparent inconsistency between Federal statutes and regulations and the terms and <br />conditions contained in this award must be referred to the DOE Award Administrator for <br />guidance. <br />2. AWARD AGREEMENT TERMS AND CONDITIONS <br />This award/agreement consists of the Assistance Agreement, plus the following: <br />a. Special Terms and Conditions. <br />b. Attachments: <br />Attachment Number Title <br />1. Intellectual Property Provisions (incorporated by reference for a recipient <br />who uses the Research Terms 8e Conditions shown in paragraph 2.e.) <br />2. Statement of Project Objectives <br />3. Federal Assistance Reporting Checklist and Instructions <br />4. Budget Information (SF 424A) <br />c. Applicable program regulations <br />d. DOE Assistance Regulations, 10 CFR Part 600 at htto://ecfr.?poaccess.aov. <br />e. Application/proposal as approved by DOE. <br />f. National Policy Assurances to Be Incorporated as Award Terms in effect on date of <br />award at http://enerE:y.[3ov/manaeement/downloads/national-policy-assurances-be- <br />incorporated-award-terms <br />3. ELECTRONIC AUTHORIZATION OF AWARD DOCUMENTS <br />Acknowledgement of award documents by the Recipient's authorized representative <br />through electronic systems used by the Department of Energy, specifically Fed Connect, <br />constitutes the Recipient's acceptance of the terms and conditions of the award- <br />Acknowledgement via Fed Connect by the Recipient's authorized representative <br />constitutes the Recipient's electronic signature. <br />4. AWARD PROJECT PERIOD AND BUDGET PERIOD <br />The Project Period for this award is 02/22/2012 through 02/21/2013, consisting of the <br />following Budget Periods: <br />Budget Period Start Date End Date <br />1 02/22/2012 02/21/2013 <br />16