My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - TRAINING AND EXERCISE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
10/15/2012
>
25C - AGMT - TRAINING AND EXERCISE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 2:42:30 PM
Creation date
10/11/2012 2:42:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25C
Date
10/15/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) Cost D) Maximum Number of Exercise <br />Participants for the Stated Cost E) Duration of the Exercise <br />$87,000 300 6 - 8 hours <br /> CBRNE Workshop or Tabletop Exercise <br />A) Type B) Exercise Theme <br />Workshop p or CBRNE. Like the Citizen Preparedness Symposium or Workshop, the CBRNE <br />Tabletop event can take two directions. Should a workshop be desired, participants <br />Exercise from throughout the UA/OA would gather to exchange information that <br /> would lead to a workshop product (e.g. Joint Hazard Assessment Team <br /> Strategy). A tabletop exercise would likely test the UA/OA's ability to prevent, <br /> protect, mitigate, respond and recover from a CBRNE event. Evaluation <br /> would focus on UA/OA plans, policies, and procedures. <br />C) Cost D) Maximum Number of Exercise E) Duration of the Exercise <br /> Participants for the Stated Cost <br />$36,000 50 4 - 6 hours <br />Exercise Name I I Decontamination Drill <br />A) Type B) Exercise Theme <br />Drill Decontamination. This exercise can focus on traditional UA/OA HAZMAT <br /> resources or the event could be used to iupport the training needs of <br /> Hospital personnel on the use of their decontamination equipment. <br /> Moreover, a hybrid or joint training exercise could be conducted with both <br /> HAZMAT and Hospital personnel. We will work with the EDT to determine the <br /> scope and objectives of this exercise which will determine exercise <br /> participation. <br />C) Cost D) Maximum Number of Exercise E) Duration of the Exercise <br /> Participants for the Stated Cost <br />$65,000 100 4 - 6 hours <br />51 Page <br />25C-16
The URL can be used to link to this page
Your browser does not support the video tag.