My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - VARIANCE - 2702 N BRISTOL ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
10/15/2012
>
31B - VARIANCE - 2702 N BRISTOL ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 3:17:22 PM
Creation date
10/11/2012 3:17:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
10/15/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Variance No. 2012-07 <br />September 24, 2012 <br />Page 2 <br />A contemporary architectural design has been proposed by the developer. The building will <br />incorporate relief in the massing through the use of different building volumes and materials. <br />Exterior materials such as cedar wood siding, smooth trowel stucco, stone veneer and dark bronze <br />aluminum windows will be utilized on the structure. <br />Access to the project site will be provided from both Bristol Street and Memory Lane. The parking <br />requirement for a bank use is 4 spaces per 1,000 square feet of building (Section 41-1348). A total <br />of 24 parking spaces will be provided on-site, which is in compliance with code requirements <br />(Exhibits 3, 4 and 5). <br />Proiect Background <br />The project site is currently vacant, but was previously occupied by a service station use from the early <br />1960's until 1998. In late 1998, the necessary permits were issued to demolish the service station <br />facility. In 1999, plans were submitted to construct a new service station on the property, with the City <br />approving a zone change to redesignate the property from Specific Development No. 27 (SD-27), <br />which allowed the development of apartments, to Community Commercial (C-1). Although the <br />necessary entitlements were granted for this new service station, permits were never issued, and the <br />site has remained vacant. <br />General Plan and Zonina Analvsis <br />The General Plan land use designation for the site is General Commercial (GC), which allows for <br />retail, office and commercial uses such as banks. General Commercial districts are primarily <br />located on commercial corridors and major arterial roadways in the City. They provide accessible <br />commercial development along City arterials as well as provide support facilities and services, <br />including banks and financial institutions. The site is consistent with this General Plan land use <br />designation. <br />The subject site is located in the Community Commercial (C-1) zoning district. The C-1 district is a <br />zoning designation that allows for retail, commercial and office uses such as a bank or other <br />financial institution. The proposed project is consistent with the C-1 zoning designation. <br />Proiect Analysis <br />Regarding this project, Sections 41-368, 41-369 and 41-372 (a) of the Santa Ana Municipal Code <br />(SAMC) states that buildings in the C1 zone requires a 15 foot front and side yard landscaped <br />setback if the yard abuts a public street, as it does in this case along both Bristol Street and Memory <br />Lane. As proposed, the building will have a five foot setback along Bristol Street (after an eight foot <br />dedication for street widening purposes) and an eight foot setback along Memory Lane. The <br />applicant is requesting approval to allow the reduced setback to remain as proposed, which would <br />require the approval of a variance from the code discussed above. <br />31 B-4
The URL can be used to link to this page
Your browser does not support the video tag.