My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUKE'S ROOT CONTROL, INC. 2 - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
DUKE'S ROOT CONTROL, INC. 2 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 4:08:13 PM
Creation date
10/17/2012 7:42:43 AM
Metadata
Fields
Template:
Contracts
Company Name
DUKE'S ROOT CONTROL, INC.
Contract #
N-2012-123
Agency
PUBLIC WORKS
Expiration Date
6/30/2013
Insurance Exp Date
1/1/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />FXYiIB7T A <br />PEE SCFIEriuLE <br />�upiza�� <br />� FEE SCHEDULE <br />PIPE S12E <br />UNIT PRICE <br />� Manfroles <br />$� 25.00 /each <br />House Laterals <br />$125.00 /each <br />6 inch Pipe <br />$1.59 /foot - <br />S inch Pipe <br />$i.59/foot <br />� �! O Inch Pipe <br />$1.76/foot <br />12 inch Pipe <br />$i .92lfoot <br />' 15 inch Ptpe <br />$2.73 /foot <br />Prices are computed per linear foot, manhole Eo manhole, and Duke's standard guarantee <br />applies to alt sanitary sewers treated. Please note that a $3,000 minimum is required, and <br />prices for pipes larger than 15 Inch are determined on a case -by -case basis. <br />GUARANTEE <br />Contractor guarantees to kill all the roots in every sewer it treats In order to eliminate main line <br />sewer stoppages caused by live tree roots. <br />if a treated sewer plugs up and floods due to five tree roots during the guarantee period {see <br />� below), CONTRACTOR will RE -TREAT that section, AT 1T'S OWN EXPENSE, or remit to the <br />City t00% at the payment received to treat that section of sewer. <br />The decision of the City as to the cause of the plug -up is binding. <br />Contractor will apply this guarantee for a period of two (2) years, beginning on the date of <br />treatment, and ending two years after the date of treatment. <br />Contractor will provide a THREE -YEAR GUARANTEE on any paid repeat applications that are <br />! performed within six months of the expiration date of the previous guarantee period. <br />� Re- treatments, pertormed at no charge in honor of the guarantee, do not extend the expiration <br />date of the guarantee. <br />This guarantee applies only to sewer stoppages caused by Siva tree roots. it does not apply to <br />stoppages caused by grease or other foreign matter; flat, collapsed or deformed pipe; or <br />flooding caused by a surcharged or plugged sewer section downstream from a guaranteed <br />sewer section. Contractor shall not be responsible for any damages caused by sewer <br />i stoppages. <br />This guarantee applies to main tine sewers only. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.