My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - ZONING 2500 N MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
11/19/2012
>
75A - PH - ZONING 2500 N MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:17:19 PM
Creation date
11/15/2012 3:16:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/19/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Kellee Preston <br />October 17, 2012 <br />Page 8 <br />• Full Project with Auditorium used as a Theater (Weekdays) <br />o On -site parking supply (182 spaces) <br />o Share Citibank Parking (220 spaces) <br />• Full Project with Auditorium used as a Theater (Weekends) <br />o On -site parking supply (182 spaces) <br />o Share Wells Fargo Parking (175 spaces) <br />o Share Citibank Parking (25 spaces) <br />• Special Event (Weekdays) <br />o On -site parking supply (182 spaces) <br />o Share Citibank Parking (475 spaces) <br />• Special Event(Weekends) <br />o On -site parking supply (182 spaces) <br />o Share Wells Fargo Parking (175 spaces) <br />o Share Citibank Parking (250 spaces) <br />With the utilization of the on -site parking supply and through shared parking arrangements with <br />Citibank and Wells Fargo, the projected peak parking demand of the Project can be <br />accommodated with the occupancy of the full Project. <br />PARKING MANAGEMENT PLAN (PMP) <br />In order to manage projected future demands for the Center, strategies were considered for the <br />PMP. A detailed PMP for the Center is provided in a separate memo. <br />SUMMARY <br />• Parking observations conducted at the Center indicated that the peak parking demand <br />occurred on weekday at 1:00 PM when 261 spaces were occupied. The peak parking <br />demand on a weekend occurred at 2:00 PM, when 243 spaces were occupied. <br />• With occupancy of the full Project and the auditorium used as exhibit space, the <br />projected peak parking demand for the Center is 384 spaces (301 customer spaces and <br />83 employee spaces). <br />• With occupancy of the full Project and the auditorium used as a theater, the projected <br />peak parking demand for the Center is 400 spaces (318 customer spaces and 82 <br />employee spaces). <br />• With occupancy of the full Project during special events, the projected peak parking <br />demand for the Center is 656 spaces (573 customer spaces and 83 employee spaces). <br />• Given a proposed on -site parking supply of 182 spaces, occupancy of the full Project <br />with the auditorium used as exhibit space results in a potential shortfall of 202 parking <br />75A -27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.