Laserfiche WebLink
AGREEMENT NO. C-2-1849 <br />EXHIBIT C <br />M EXHIBIT C: FINAL PROJECT REPORT FORM <br />OCTA Date <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. In addition, the agency must attach before (if available) and after photographs of the project site <br />and the address or location of the site under the Location and Scope of work section. <br />Project <br />Location and Scope of Work <br />I <br />Verification of Match <br />(Actual Expenditures) <br />Local Match <br /> <br /> <br />Phase <br />(ENTER <br />SOURCE <br />(ENTER <br />SOURCE <br />(ENTER <br />SOURCE <br />SLPP <br />Formula Other <br />OCTA <br />Funding <br /> <br />Total <br />Engineering $ - $ - $ - $ - $ - $ - <br />Right-of-Way $ - $ - $ - $ - $ - $ - <br />Construction $ - $ - $ - $ - $ - $ - <br />Total $ - $ - $ - $ - $ - $ - <br />Project Schedule <br />Match <br />Rate <br />0% <br />Phase Proposed Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Read to Advertise <br />Award Construction <br />Project Completion (open for use <br />Page 1 <br />25G-20