My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - COOP JOINT PAVEMENT REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
11/19/2012
>
25G - AGMT - COOP JOINT PAVEMENT REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2012 5:39:03 PM
Creation date
11/15/2012 5:38:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/19/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT BETWEEN THE CITY OF TUSTIN AND THE CITY OF SANTA ANA <br />FOR THE PAVEMENT REHABILITATION OF MCFADDEN AVENUE <br />BETWEEN MANTLE LANE AND PASADENA AVENUE <br />This agreement ("Agreement"), made and entered into this day of , <br />2012, by and between the CITY OF TUSTIN, a municipal corporation ("TUSTIN"), and <br />the CITY OF SANTA ANA, a municipal corporation ("SANTA ANA"). <br />RECITALS: <br />A. WHEREAS, TUSTIN and SANTA ANA desire to enter into an Agreement <br />to reconstruct and resurface the roadway pavement on McFadden Avenue between <br />Mantle Lane and Pasadena Avenue. Related work on the project will include signing <br />and striping; sidewalk and curb/gutter repair; replacement of curb ramps to be in <br />compliance with current federal Americans with Disabilities requirements; and <br />adjustment of manholes and water valves to grade. This work will hereinafter be <br />referred to in this Agreement as the "PROJECT"; and <br />B. WHEREAS, the PROJECT is included in TUSTIN plans titled McFadden <br />Avenue Pavement Rehabilitation Project between Mantle Lane and Pasadena Avenue <br />(CIP No. 70213); and <br />C. WHEREAS, the PROJECT lies partly within the corporate and <br />jurisdictional limits of SANTA ANA and partly within the corporate and jurisdictional <br />limits of TUSTIN; and <br />D. WHEREAS, SANTA ANA and TUSTIN are each empowered by law to <br />expend public monies to improve McFadden Avenue; and <br />E. WHEREAS, SANTA ANA and TUSTIN desire to accomplish all of the <br />needed work as described herein by a single public works project in which TUSTIN will <br />act as the Lead Agency, and SANTA ANA will reimburse TUSTIN for SANTA ANA's <br />portion of the design and construction costs; and <br />F. WHEREAS, TUSTIN is in the process of completing the design plans, and <br />SANTA ANA will review and approve the design plans upon completion; and <br />G. WHEREAS, the total PROJECT construction cost is estimated at <br />$497,000 as shown in Exhibit "A", attached hereto and incorporated herein. The total <br />estimated PROJECT design and construction costs will be divided between the parties <br />as follows: <br />TUSTIN SANTA ANA Total <br />Design cost $35,000 $15,000 $50,000 <br />Construction cost $350,000 $147,000 $497,000 <br />25G-23
The URL can be used to link to this page
Your browser does not support the video tag.