My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-12-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
12/03/2012
>
FULL PACKET_2012-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:31:53 PM
Creation date
11/29/2012 5:21:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/3/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT NO. C -2 -1640 <br />EXHIBIT E <br />EXHIBIT E: FTA 5307 FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />Local Match <br />Phase <br />(ENTER <br />SOURCE ) <br />(ENTER <br />SOURCE ) <br />(ENTER <br />SOURCE <br />FTA 6307 <br />Grant <br />Other <br />OCTA <br />Funding <br />Total <br />Engineering <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Right-of-Way <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Construction <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Total <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Project Schedule <br />Phase <br />Proposed <br />Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />Match <br />Rate <br />0% <br />25B -20 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.