My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA STATE OF-OFFICE OF TRAFFIC SAFETY -2012
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA STATE OF-OFFICE OF TRAFFIC SAFETY -2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2013 11:06:44 AM
Creation date
1/8/2013 12:47:51 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA STATE OF-OFFICE OF TRAFFIC SAFETY
Contract #
A-2012-212
Agency
POLICE
Council Approval Date
9/17/2012
Expiration Date
9/30/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana, City of <br />Schedule B-1 - Budget Narrative <br />Sobriety Checkpoint Grant Program for 2012-2013 <br />Grant No. SC13385 <br />Santa Ana, City of will be reimbursed for overtime personnel costs and checkpoint supplies to conduct the checkpoints. <br />Overtime reimbursement will reflect actual costs (overtime hourly rate and overtime benefit rates) of the personnel <br />conducting the appropriate operation(s) up to the amount of the approved cost per check point and the grant total <br />stated in Schedule B- Detailed Budget Estimate. Only actual benefits accrued from overtime hours will be covered <br />(e.g., retirement, medical/dental/vision insurance, uniform allowances will not be covered). Allowable benefits <br />include: Social Security (OASDI), Workers Compensation, Medicare, State-run disability, and unemployment <br />insurance. <br />Budgeted grant activities will be conducted by personnel on an overtime basis. The grant covers only the costs of police <br />department personnel. Grants do not cover contractual services (with the exception of contract cities). Grant-funded <br />operations may be conducted by personnel such as an officer, sergeant, corporal, deputy, community service officer, <br />dispatcher clerical/administrative, etc. depending on the titles used by the agency. Personnel will be deployed as needed <br />to accomplish the grant goals and objectives. Administrative/clerical personnel are allowable only if they worked on the <br />checkpoint operation, e.g., to process the larger than normal volume of citations, towing records, and arrest/incident <br />reports. These reports must be a result of the operation and required to be processed quickly for distribution to the courts <br />and the District Attorney's Office, or to meet statutory time limits. Clerical overtime incurred before the checkpoint or <br />more than one business day after the last day of the checkpoint is not allowable. Costs for preparing claims are not <br />reimbursable. <br />OTS-approved checkpoint supplies (cones, signage, vests, PAS devices/supplies and lighting equipment) are <br />reimbursable provided that the total cost of supplies, including tax and shipping, does not exceed the awarded <br />amount specified in Schedule B. The prices of supplies will be reimbursed at unit costs not to exceed <br />OTS-established unit costs. Other direct costs are not reimbursable, except for OTS-approved checkpoint supplies. <br />Indirect costs are not reimbursable. <br />Reimbursements are contingent upon the following (exceptions must be approved by the SafeTREC): <br />i. The applicable post-operational data have been submitted using the SafeTREC's on-line reporting <br />system. <br />ii. The claim form is correctly filled out, using the SafeTREC Excel-based form. <br />iii. The claim amounts do not exceed the limits set forth in Schedule B -Detailed Budget Estimate. <br />iv. The information in the overtime slips and the ledger report are consistent and fully support the claim. <br />V. A ledger report(s) supporting the claim amount is attached to the claim. Only source documents are <br />accepted to support the claim amount. Explanatory documentation such as spreadsheets may be <br />submitted to provide additional information but cannot be accepted in lieu of a ledger report(s). <br />vi. Contract cities only: A contract city must also provide the sheriffs department's invoice to the contract <br />city for the checkpoint overtime costs described in the contract city's claim. The invoice (or an <br />attachment to the invoice) must contain the contract rates that are the basis for the sheriff's <br />department's invoiced amount. The contract city must provide a ledger report showing payment of the <br />invoice amount. If a sheriffs department or police department is administering the grant for a <br />contract city, then that administering agency must provide the ledger report only. <br />vii. An invoice(s) for the amount of checkpoint supplies is attached to the claim. The invoice must contain a <br />sufficient description of the purchased item(s), quantity, and unit cost. <br />viii. The claim is signed by the Authorizing Official (Box B of the grant cover page) or Individuals Authorized <br />to Sign Claims (Box D) as designated in the grant cover page. <br />ix. Changes in the Authorizing Official For the Applicant Agency or the designation of any other additional <br />individual(s) to sign claims are documented in accordance with SafeTREC documentation requirements. <br />X. The final claim is submitted no later than October 31, 2013. <br />page 6
The URL can be used to link to this page
Your browser does not support the video tag.