Laserfiche WebLink
Orange County Bridge to Engineering (OC B2E) <br />(H -1B Technical Skills Training Grant) <br />BUDGET <br />Year 1 <br />Year 2 <br />Year 3 <br />Year 4 <br />TOTAL <br />Personnel <br />Victor Delgado <br />Project Coordinator /Counselor <br />10% overload, Yrs 1 &2; <br />12.5% overload, Yrs 3 &4 <br />$ 6,491 <br />$ 6,621 <br />$ 8,441 <br />$ 8,610 <br />$ <br />30,163 <br />Kenneth John Faller II <br />Engineering Faculty <br />50% time <br />2 summer month, Yrs 1 -3 <br />$ 8,779 <br />$ 8,954 <br />$ 9,133 <br />$ 0 <br />$ <br />26,866 <br />Tutors <br />(undergraduate students) <br />$ 5,400 <br />$ 5,400 <br />$ 5,400 <br />$ 3,065 <br />$ <br />19,265 <br />TBD: <br />Summer Workshop Faculty <br />$ 7,089 <br />$ 0 <br />$ 0 <br />$ 0 <br />$ <br />7,089 <br />TBD: <br />Summer Workshop <br />Student Assistants <br />$ 3,600 <br />$ 0 <br />$ 0 <br />$ 0 <br />$ <br />3,600 <br />Salaries & Wages <br />$ 31,359 <br />$20,975 <br />$22,974 <br />$11,675 <br />$ <br />86,983 <br />Fringe Benefits <br />$ 2,764 <br />$ 2,436 <br />$ 2,963 <br />$ 2,708 <br />$ <br />10,871 <br />28.835% rate applied to V. Delgado overload; <br />1.45% rate applied to faculty summer salary; <br />7.35% payroll taxes for student wages <br />Travel (incl. Cohort field trips) <br />$ 894 <br />$ 1,000 <br />$ 2,000 <br />$ 2,000 <br />$ <br />5,894 <br />Other: Summer 2012 <br />Engineering Workshop <br />$ 900 <br />$ 0 <br />$ 0 <br />$ 0 <br />_$ <br />900 <br />TOTAL DIRECT COSTS $ 35,917 $ 24,411 $ 27,937 $ 16,383 $104,648 <br />INDIRECT COSTS <br />(35.1 %) $ 12,607 $ 8,568 $ 9,806 $ 5,751 $ 36,732 <br />TOTAL COSTS $ 48,524 $ 32,979 $ 37,743 $ 22,134 $141,380 <br />EXHIBIT E <br />