My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8E - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8E - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:26:22 PM
Creation date
1/9/2013 12:15:08 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2012-074
Agency
PUBLIC WORKS
Council Approval Date
4/2/2012
Expiration Date
12/31/2013
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003 Amended by A-2013-025, -01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8F - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Cover Letter <br />Subject: Revised Proposal to Prepare Euvironnnental Documents for the Warner Avenue Widening Project <br />Dear Ms. Amirani: <br />We appreciated the opportunity to meet with you, Jason and Kenny last week to review our proposals for road - widening <br />projects in the City of Santa Ana. Per our discussion, we have updated the scope of work, schedule and cost estitrate to more <br />closely meet the CIty's objectives. This January 26, 2009 submittal incorporates the following changes subsequent to the <br />updates the forwarded to you on January 20, 2009: <br />• Elimination of the Public Outreach scope of work (Arellano Associates will no longer participate in this effort) <br />• Reduction of meeting and public hearing attendance. As detailed in the attached scope of work, The Planning <br />Center will participate ht up to 12 meetings (including Public Works staff meetings, IiTAC, and Redevelopment <br />Agency Meetings) and up to five publlc meetings assumed to include a Public Scoping meeting, two Planning <br />Commission Public Hearings, and two City Council Public Hearings. Subconsultant meeting attendance has <br />not been changed and is detailed In the Scope of Work. <br />• The schedule has been substantially reduced, primarily reflecting reductions in longer and multiple reviews <br />anticipated if the process included Caltrans. It is now anticipated that the environmental process, exclusive of <br />public hearings, can be completed by the end of January 2009. <br />• Hardcopy EIR production was fitrtiter reduced (from 50 copies to 25 copies), relying on electronic copies. <br />The following changes incorporated in our previous submittal remain vnlid for this updated proposal: <br />• All work associated with the NEPA process has been eliminated; <br />• Legal descriptions have been removed; <br />• Landscaping design and plan have been removed; <br />• Relocation Plan has been removed; <br />• Ground surveys have been ininhnized; <br />• Right -of -way analysis has been reduced; <br />• Project management hours have been reduced; <br />• Reimbursable hard copies have been reduced in favor of CDs; <br />• The mark -up percentage has been reduced to comply with the City requirements; <br />• A new teann member, Urbana Preservation and Planning, has been brought In to reduce the cost of the <br />cultural /historical analysis. <br />Willi the exception of Arellano Associates, the project team remains as proposed in our previous submittal. As Lead <br />Consultant, The Planning Center's Director of Environmental Services, JoAnn Hadfield, will serve as overall Director-in- <br />Charge and primary contact for [lie City. Our ht- !rouse team will be supported by: <br />+ Urbana Preservation and Planning — Archaeological /historical resources <br />• IBI Group -- design and engineering, traffic analysis, hydrology and drainage studies, landscape design <br />• VA Consulting -- field surveying, topo and utility mapping, and right -of -way trapping <br />• GeoLogic Associates— geotechnical report, site assessment and hazardous waste <br />• Cogstone -- paleontological resources <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Widening Project The Planning Center I Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.