My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - STORM DRAIN MASTER PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
20C - AA - STORM DRAIN MASTER PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 5:19:58 PM
Creation date
1/17/2013 4:49:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
1/22/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Storm Drain Master Plan <br /> <br /> <br /> Experience with the County of Orange Public Works-Flood Division. Our staff is experienced in working with the <br /> criteria and procedures used by local agencies and the County of Orange. RBF has been an on-call consultant to <br /> the Orange County Public Works-Flood Division for the past decade. Past projects have required development of <br /> accurate models for detention / retention basin analysis, urban runoff management plans, facility designs, <br /> hydraulic deficiency studies, master plans, overflow/street flow analysis, and channel routing studies. RBF has <br /> completed numerous drainage studies of urban areas using the standard AES Software and more advanced <br /> programs such as XP-SWMM (same hydrodynamic engine as CivilStorm), including recent one- and two- <br /> dimensional modeling for the Orange County Public Works Department for Midway City. As part of these and <br /> other projects, RBF staff members have developed expertise in identifying creative solutions to complex drainage <br /> issues and in incorporating these solutions into comprehensive Capital Improvement Programs. <br /> Our experience in developing master plan projects includes: <br /> • City of Anaheim -Storm Drain Master Plan ¦ City of Yucaipa Master Plan Update <br /> • County of Orange-San Diego Creek Master Plan of Drainage ¦ Southern California Logistics Airport Drainage Master Plan, Victorville <br /> • City of Buena Park-Storm Drain Master Plan • March Air Force Base Reuse Storm Drain Master Plan, Riverside <br /> • Midway City Drainage Master Plan, Unincorporated Orange County • Focused Master Plan of Drainage, Lathrop <br /> • Storm Water Runoff Management Plan for Talega Valley, San Clemente ¦ City of Brisbane Storm Drain Master Plan <br /> • Heritage Fields & Orange County Great Park Drainage Master Plan, Irvine ¦ Hillside Drainage Study and Capital Improvement Program, El Cajon <br /> ¦ Tustin Legacy - Runoff Management Plan • Drainage Facilities Master Plan Updates SDA 2 & SDA 9, San Diego County <br /> • Northern Sphere Master Plan of Drainage, Orange County ¦ Town of Los Gatos Master Plan of Drainage <br /> ¦ Tonner Hills Runoff Management Plan, Unincorporated Orange County ¦ Port of San Diego GIs Storm Water Data Management Project <br /> • Santiago Hills Phase II Master Plan Drainage, Orange County ¦ Otay River Watershed Management Plan, San Diego <br /> • Peters Canyon Channel Watershed Update, Orange County ¦ Naval Training Center (Liberty Station) Redevelopment, San Diego <br /> • Barranca Channel Watershed Update, Orange County ¦ Marshburn Channel Watershed Update, Irvine <br /> • City of Stanton, Master Plan of Drainage <br /> <br /> Geographic Information Systems <br /> - With over 23 years experience developing GIS based technology solutions and <br /> using the latest tools including advanced web based online applications, RBF <br /> offers a comprehensive set of GIS services capable of handling the entire span <br /> of discipline workflows in a common environment. RBF's GIS experience <br /> provides a clear understanding of the technology required to create and <br /> manage information. RBF is known for being on the forefront of leveraging <br /> technology to provide better services to our clients. As an ESRI Business <br /> Partner, RBF is in a position to keep abreast of the latest GIS technologies and <br /> maintains a full suite of GIS programs and extensions. With nearly a hundred <br /> Online interactive web sites internal ArcGIS users RBF has the resources to complete large and small scale <br /> prepared as part of the master projects. RBF maintains a fully implemented service employing ArcGIS Server <br /> plan update for the City of Yucaipa and develops applications in the Silverlight environment for advanced media <br /> and as a system-wide mapping rich user environments. These online mapping tools can be hosted by RBF or <br /> tool for the County of San brought in-house by our clients. <br /> Bernardino. <br /> Our GIS services can be used to provide easy access to the City for project <br /> status and quality control throughout plan development, as well as ongoing agency management of drainage <br /> master plan implementation. For one municipality, RBF created a custom Interactive Online Facility Mapping Web <br /> Site based on the GIS database of drainage facilities developed for the project. This application belongs to the City <br /> and enables staff to update or modify facilities on a continuous basis, creating a master plan that is always current, <br /> minimizing the need for future updates. <br /> 3 <br /> COHBUtiha <br /> 20C-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.