Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> Plan- <br /> modeling program CivilStorm. The hydraulic model developed as part of this task will provide the baseline model <br /> to identify system deficiencies and to test the modification alternatives of the recommended storm drain <br /> improvements. The storm drain water surface profile models will only be generated for the main "collector" or <br /> "trunk" storm drain lines (storm drain lines of 36" and larger, estimated to be 42 miles from current County data), <br /> and the private or local facilities outside of public right-of-way intercepting the lot/building surface drainage will <br /> not be analyzed. The water surface data and hydraulic information will be summarized in tabular format for each <br /> reach or element of the facility to allow easy use and review. <br /> Deliverables: <br /> 1. Hydraulic Network in CivilStorm <br /> <br /> Task 3.2 Existing Municipal Storm Drain - Capacity Analysis, Hydraulic Deficiency Identification, Flooded Width <br /> Calculation <br /> The hydraulic models generated for the "existing" mainline storm drain systems will be analyzed in a sensitivity <br /> analysis to determine the maximum hydraulic "capacity" of the system. The maximum allowable hydraulic <br /> capacity will be defined as the highest elevation of the hydraulic grade line below the street that allows the surface <br /> inlets to function. A sensitivity analysis will be performed by factoring the "design" discharges to a lower amount <br /> until the storm drain operates without causing flooding of surface inlets. The hydraulic model will also more <br /> accurately quantify with a numerical amount the amount of hydraulic conveyance that the existing system is <br /> deficient. The hydraulic capacity will be converted to "level of flood protection" numerical value through a ratio of <br /> the capacity flowrate to the estimated 100-year ultimate flowrate. <br /> As part of the CivilStorm modeling results, RBF will evaluate where street flooded width calculations, based on <br /> gutter flow, at critical street locations. The calculations will be conducted to ensure conformance with City <br /> drainage design criteria. The street flooded width analysis will be based on normal depth calculations and using <br /> City of Santa Ana standard street sections. The street flooded width calculations will be used to identify locations <br /> that do not meet City critical and may require additional underground storm drain improvements. <br /> Deliverables (Tables summarizing): <br /> 1. Capacity Analysis <br /> 2. Flooded Width Analysis <br /> Task 3.3 Deficiency Removal and Alternatives Formulation / Feasibility Analysis /CIP <br /> RBF will develop preliminary alternatives formulation for removal of hydraulic deficiencies within the existing <br /> "mainline" storm drain improvements. The conceptual assessment will focus on either utilizing (1) increasing the <br /> hydraulic capacity through enlarged drainage facilities or new parallel system adjacent to existing facilities, (2) <br /> diversion system, or (3) detention storage for flow reduction and water quality benefits. The overall watershed <br /> system will be divided into study reaches for refined analysis on a reach-by-reach basis (within the predefined <br /> Drainage Areas). A list of potential design options will be identified which meet the primary flood protection <br /> objectives and major constraints associated with the alternatives will be discussed. A feasibility analysis will be <br /> performed to screen the alternatives and develop the recommended alternative based on selection criteria, <br /> including least costs and minimize public impacts. <br /> Deliverables: <br /> 1. A technical memorandum will be prepared that summarizes the results of the alternatives analysis. The <br /> memorandum will serve to reference the methodology, design assumptions, guidelines, and criteria <br /> developed for the identification and evaluations of the drainage alternatives. The text of the document <br /> will be prepared on MS Word. <br /> I <br /> Task 3.4 Drainage Improvement Facility Sizing and Alignment <br /> Utilizing the results of Task 3.3, RBF will determine the proposed increased pipe sizing based upon the <br /> hydrodynamic hydraulic analysis. Preliminary horizontal and vertical alignments will be developed for the <br /> `8u4';F` 24 <br /> 20C-25 <br />