Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> COOPERATIVE AGREEMENT NO. C-2-1992 <br /> ATTACHMENT A <br /> database. Node or intersection numbering scheme must remain consistent with <br /> ROADS. Any modifications, additions, or removal of intersections or roadway segments <br /> (nodes or links) must be approved by Authority Section Manager - Planning/GIS, <br /> Planning and Analysis and the APM. CONSULTANT shall calibrate the model based on <br /> travel time, delay studies, field observations of queue lengths, and saturation flows for <br /> heavy movements at key intersections. Tru-Traffic Software version 10.0 or latest <br /> release should be used, subsequent to initial Synchro optimization, to augment and <br /> enhance green band throughput (offset, splits, phase rotation); and, to incorporate <br /> specific off band coordinated traffic platoons into the corridor operation as required by <br /> data analysis and field observations. <br /> The CONSULTANT may use their own numbering scheme for use in Synchro analysis if <br /> the volume balancing and other factors becomes an issue with node numbering in <br /> regard to OCTA ROADS Database. If the CONSULTANT chooses to use this <br /> methodology, the requirement for submittal of the database in the ROADS format is still <br /> required. The extra node numbering used for volume balancing nodes and other factors <br /> must be removed upon final submittal of the Synchro document that will be incorporated <br /> into the ROADS database. These operations will be closely monitored and controlled <br /> through the APM and the Section Manager of the GIS department of Planning. <br /> <br /> CONSULTANT shall evaluate signal timing and coordination parameters with <br /> consideration for the following: <br /> <br /> o Optimize coordination timing using: <br /> • Modified Phase Sequence Rotation <br /> • Overlap or display output phase transfer techniques to reservice <br /> phases with capacity problems (Ring - Barrier Logic) <br /> • Protected/Permissive operations <br /> o Phasing will be lead/lead only; or, <br /> o Flashing Yellow Arrow technique may be employed for lead/lag <br /> if controlling/owner AGENCY permits its use <br /> • Harmonic cycling - double, half, third or other harmonic multiple, <br /> • Other innovative techniques <br /> o CONSULTANT will measure the saturation flow rates at key project <br /> intersections during one peak hour where the overall intersection volume-to- <br /> capacity ratio is greater than or equal to 0.8 as a calibration for the Synchro <br /> model <br /> <br /> o Timing parameters which provide adequate splits and corresponding offsets <br /> which fully accommodate pedestrians within the split time. CONSULTANT <br /> shall take into consideration the pedestrian timing parameters used by the <br /> local AGENCY on a case by case basis. Pedestrian Intervals shall be <br /> examined and retimed to current adopted standards by each respective <br /> AGENCY. CONSULTANT should note that proposed new pedestrian timing <br /> standards have been approved at the Federal level and about to be approved <br /> <br /> 9 <br /> <br /> 25D-26 <br />