<br /> <br /> <br /> <br /> COOPERATIVE AGREEMENT NO. C-2-1992 <br /> ATTACHMENT A <br /> <br /> be constructed. See Task 3: Field Review, Plans Specifications and Estimates, <br /> Design Standards and Requirements for allowed systems and sub systems, sole <br /> source, and design requirements for all equipment to be installed.); and <br /> <br /> 5. Attention is directed to Section 86 - 1.05 WARRANTIES, GUARANTIES, and <br /> INSTRUCTION SHEETS of the State Standard Specifications. <br /> CONSULTANT shall provide the following: <br /> a. 1 YEAR GUARANTEE on LABOR and MATERIAL for all equipment <br /> furnished, installed, and/or modified <br /> b. 3 YEAR GUARANTEE on Firmware and Software Patches, Fixes, Updates, <br /> and Upgrades for <br /> o Central Systems Control and Communications, <br /> o Field Master, and Local intersection controller units <br /> Maintenance Contracts or extra fees for these specific tasks and deliverables shall <br /> not be allowed nor charged to any PARTY or AGENCY by either the CONSULTANT, <br /> his/her Sub - Consultants, and/or vendors/suppliers, either jointly or severally, of the <br /> specified systems and related components for this service or task. <br /> <br /> Enforcement of Standard Warranties or Guaranties for hardware and software or <br /> firmware specified heretofore shall be the sole responsibility of the AGENCY <br /> receiving the equipment. <br /> Deliverables - Task 7: <br /> 1. Procure and install any and all equipment as specified but within budget for the <br /> PROJECT as proposed in the Scope of Work and Attachments or Appendices. <br /> 2. Negotiate with APM and AGENCY representatives on alternative procurements or <br /> substitutions as deemed necessary during the course of the PROJECT. <br /> 3. AS BUILT Plans and Specifications. <br /> 4. All WARRANTIES and GUARANTIES as specified <br /> <br /> <br /> Task 8: Continuing Signal Timing Support <br /> <br /> CONSULTANT will provide "on-call" signal timing support services for a period of two <br /> years or 24 months following the implementation and fine - tuning of the final signal <br /> timing plans, Task 5, to address any future adjustments that may be needed during this <br /> period. Depending on the nature of the adjustment, CONSULTANT may accomplish the <br /> fine-tuning adjustments remotely from the Consultant's office through the traffic <br /> management systems. During this 24-month period CONSULTANT will be prepared to <br /> review any project intersection requested by the PARTIES within (24) hours of written <br /> notice, including observing and fine-tuning the signal timing. <br /> CONSULTANT will drive the length of the project arterial during all designated corridor <br /> synchronization timing plan hours of operation on a monthly basis in order to verify that <br /> the synchronization timing is working as designed, and complete any necessary <br /> <br /> <br /> 13 <br /> <br /> 25D-30 <br />