My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-01-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
FULL PACKET_2013-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 11:38:36 AM
Creation date
1/17/2013 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q. SCOPE OF WORK <br />SPECIAL PROVISIONS <br />The Request for Proposals calls for removal and disposal of existing <br />luminaires; furnishing and installing new LED street lights and all testing, <br />including photometric and energy consumption, to prove that furnished <br />luminaires perform as specified. <br />The Contractor shall provide at its own risk and cost all labor, materials, tools, <br />equipment, and traffic control per the Work Area Traffic Control Handbook <br />("WATCH"), transportation, hauling, dumping, and recycling of removed <br />material as part of this project. The City reserves the right to salvage existing <br />luminaires. All salvaged luminaires shall be delivered to the City Corporate <br />Yard at no cost to the City. <br />FUNCTIONS AND RESPONSIBILITIES <br />A. DIRECTOR <br />The Director or his authorized representative shall have the authority to <br />accept/reject materials, workmanship and to make minor changes in work or <br />schedule. When the performance of the work or completion per schedule is <br />determined to be substandard, Director may 1) recommend that all or a portion <br />of payment be withheld, and/or forfeiture for delay be assessed; 2) direct the <br />work be accomplished by a separate contractor, in order to complete the <br />necessary work as close to schedule as possible and withhold the resulting <br />costs. Payment to be withheld shall be deducted from the next monthly <br />payment due to the Proposer, or if the amount is insufficient to cover payment, <br />the Proposer shall be liable and will be billed accordingly. <br />The Director or his authorized representative shall decide all questions, which <br />may arise as to the manner of performance and completion per schedule, <br />acceptable fulfillment of the contract by the Proposer, interpretation of the <br />specifications, and compensation to include completion of work by alternate <br />sources. <br />B. PROPOSER <br />Local Office <br />The Proposer shall maintain a local office with a competent representative who <br />can be reached during normal working hours and authorized to discuss matters <br />pertaining to this contract with the Director. Proposer will not be allowed to <br />store equipment or materials at any contracted area. <br />2. Submittals <br />The Proposer shall submit to the Director at the beginning of work, 1) a detailed <br />job schedule, 2) names and titles of all persons working on the project, and 3) <br />materials to be used on the project for approval. All submittals shall be <br />periodically updated as necessary. The Director shall be immediately notified <br />20D-20
The URL can be used to link to this page
Your browser does not support the video tag.