Laserfiche WebLink
Firm and Personnel Experience <br /> Size of Staff <br /> <br />Firm Profile California Offices: 500+ <br /> Baker Companywide: 3,250 <br />RBF Consulting (RBF), a Company of Michael Baker Corporation - one of Established (RBF): 1944 <br />the largest planning, engineering, design and construction management Established (Baker): 1940 <br />firms in the Nation - has more than 3,200 professionals with gross Number of Offices: 107 <br />engineering revenue of more than $530 million. The firm's combined <br />resources serve local, national and international markets, with the western States Offices: <br />capability to provide a comprehensive range of services on a national Camarillo, CA <br />Carlsbad, CA <br />scale for all sizes and categories of projects. Irvine, CA <br /> Las Vegas, NV <br />Established in Orange County in 1944, RBF has served the county for 68 Los Angeles, CA <br />years, providing planning and design for public works projects, and Monterey Bay, CA <br />development of major infrastructure. Oakland, CA <br /> Ontario, CA <br />The RBF/Baker rankings are in the top 10 percent of U.S. Palm Desert, CA <br />engineering practices by Engineering News-Record (ENR). Phoenix, AZ <br /> Sacramento, CA <br /> <br />RBF offers a full-service, in-house team of local professionals that will , CA <br />San San Jose, Diego, <br />provide all of the services needed for the preparation of a new Storm Temecula, CA <br />Drain Master Plan for the City of Santa Ana. From our local Orange Tucson, AZ <br />County office, RBF has available staff with proven experience in drainage Walnut Creek, CA <br />master planning, storm water quality, geographic information systems, <br />field surveying, and capital improvement program development. Services Provided: <br /> Planning: <br />As a leader in the field of water resources and public works engineering, Stormwater Management <br />RBF provides a full range of professional services from analysis, concept Watershed Management <br />and design through construction support. As part of our commitment to Water Resources <br />the water resources field, RBF has a specialized staff of over 30 local Environmental Services <br />engineers in Orange County dedicated to flood control engineering, storm Regulatory Permitting <br />water management and water quality services, providing our team with a Land Planning <br />tremendous depth of resources and experience. Transportation Planning <br />Urban Planning and Design <br /> Visual Analysis and Design <br />We bring to this project the technical capabilities needed to develop an GIS <br />effective drainage master plan, along with a history of successfully <br /> <br />working with local communities, public agencies, and stakeholders to Design: <br />Storm Water Facilities <br />incorporate their concerns and issues into the development of innovative Water / Wastewater Facilities <br />and effective project solutions. Water Quality <br /> Electrical Engineering <br />The RBF Team will work in partnership with the City, providing all the Structural Engineering <br />required services in support of this storm drain master plan project. Civil Engineering <br />Working cooperatively with City staff, we will provide the resources Transportation Engineering <br />needed to provide technical studies, advanced modeling, and review of Traffic Engineering <br />future development plans for impacts to local storm drain systems. We Landscape Architecture <br />also work with local agencies to provide hydrology / hydraulic model Construction: <br />selection, comply with NPDES permit requirements, and develop web site Field Surveying <br />applications and training to allow them to more effectively implement Mapping/ Right of way <br />and manage the drainage master plans we develop. Our staff Construction Staking <br />understands how to meet agency budget and schedule goals, and the Construction Management <br /> <br />need to consistently deliver responsive professional services. Construction Inspection <br />1 <br />co.+eu???wn <br />" ... 20C-13