My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA_2013-01-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
AGENDA_2013-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 11:34:14 AM
Creation date
1/22/2013 11:31:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Clerk of the Council
Date
1/22/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />? <br /> AGMT - With Sierra Pacific Electrical Contracting to provide and <br />install 1,123 LED street lights for an amount not to exceed <br />$700,000 <br />? <br /> AGMT - Southern California Edison to provide no-cost funding <br />through On-Bill Financing for the LED street lights <br /> <br />2. Approve an appropriation adjustment. <br /> (Requires five affirmative <br /> <br />votes) <br /> <br />APPROPRIATION ADJUSTMENT NO. 2013-075 - recognizing <br />$693,027 in funding from Southern California Edison into the Energy <br />Conservation revenue account and appropriating the same amount to <br />the Energy Conservation expenditure account for the installation of <br />LED street lights. <br /> <br /> <br />20E CONTRACT AWARD TO ALL AMERICAN ASPHALT FOR BRISTOL <br />STREET WIDENING FROM 2ND TO 10TH STREETS AND WATER AND <br />RD <br />SEWER MAIN IMPROVEMENTS FROM 3 TO 10TH STREETS <br />(PROJECT NOS. 081700, 126421 & 126422 ) AND APPROPRIATION <br />ADJUSTMENT - Public Works Agency <br /> <br /> <br />RECOMMENDED ACTIONS: <br /> <br />1. Award a construction contract to the lowest bidder, All American <br />Asphalt, Inc., for the Bristol Street widening from 2nd to 10th <br />Streets, and for the water and sewer system improvements from <br />3rd to 10th Streets, in accordance with their bid in the amount of <br />$6,169,256. <br /> <br />2. Approve the Cost Analysis, as shown in Exhibit 1, for a total <br />estimated project delivery cost of $7,711,582. <br /> <br />3. Approve an appropriation adjustment. <br /> (Requires five affirmative <br /> <br />votes) <br /> <br />APPROPRIATION ADJUSTMENT NO. 2013-081 - Accepting Orange <br />County Transportation Authority Comprehensive Transportation <br />Funding Programs Measure M2 Arterial Capacity Enhancements <br />allocation in the amount of $3,120,000 into the Measure M Street <br />Construction revenue account and appropriating the same to the <br />Measure M2 Street Construction expenditure account. Also, accepting <br />Orange County Transportation Authority Prop 1B Bond funding in the <br />amount of $3,120,000 into the Prop 1B Bond revenue account and <br />appropriating the same to the Prop 1B Bond expenditure account, for <br />the Bristol Street Widening Project (No. 08-1700). <br /> <br />CITY COUNCIL AGENDA 7 JANUARY 22, 2013 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.