Laserfiche WebLink
DETAILED PRICING - EXHIBIT B <br />REQUEST' FOR PROPOSALS LEASE - LEASEBACK SERVICES PAGE 1 <br />Description <br />Total <br />Classroom <br />Building &Site <br />Community <br />Center &Site <br />Total <br />Combined <br />Division 1- General Requirements <br />Project Manager <br />$ 60,480 <br />$ 60,480 <br />$ 120,960 <br />Project Superintendent <br />$ 65,520 <br />$ 65,520 <br />$ 131,040 <br />Clerical <br />$ 1S,960 <br />$ 15,960 <br />$ 31,920 <br />Safety Officer /Coordinator <br />$ 13,798 <br />$ 5,939 <br />$ 19,737 <br />Vehicles <br />$ 7,650 <br />$ 7,650 <br />$ 15,300 <br />Trailer <br />$ 4,950 <br />$ 4,950 <br />$ 9,900 <br />Communications <br />$ 3,575 <br />$ 3,575 <br />$ 7,150 <br />Office equipment /Supplies <br />$ 3,505 <br />$ 3,505 <br />$ 7,010 <br />Small Tools & Equipment <br />$ 3,360 <br />$ 3,360 <br />$ 6,720 <br />Temporary Utilities <br />INC <br />INC <br />INC <br />Site Cleaning <br />$ Soo <br />$ S00 <br />$ 1,000 <br />Toilets <br />$ 3,300 <br />$ 3,300 <br />$ 6,600 <br />Mobilization /Layout (no more than 1 %) <br />INC <br />INC <br />INC <br />Job Signage <br />$ 625 <br />$ 625 <br />$ 1,250 <br />Fencing /Barricades <br />$ 4,250 <br />$ 4,250 <br />$ 8,500 <br />SWPPP Compliance <br />$ 5,400 <br />$ 5,400 <br />$ 10,800 <br />Waste Disposal <br />$ 10,000 <br />$ 10,000 <br />$ 20,000 <br />Plans & Specifications reproduction <br />$ 11250 <br />$ 1,250 <br />$ 2,500 <br />Data Processing <br />$ 28,362 <br />$ 12,207 <br />$ 40,569 <br />Submittals, Shop Drawings (no more than 3 %) <br />INC <br />INC <br />INC <br />Close -out Documentation (not less than 4 %) <br />INC <br />INC <br />INC <br />Testing <br />By Owner <br />By Owner <br />By Owner <br />Final Clean <br />$ 25,200 <br />$ 12,240 <br />$ 37,440 <br />Site Cleanup <br />$ 688 <br />$ 688 <br />$ 1,376 <br />Miscellaneous <br />$ 1,100 <br />$ 1,100 <br />$ 2,200 <br />Subtotal: <br />$ 259,473 <br />$ 222,499 <br />$ 481,972 <br />Division 2- Existing <br />Conditions <br />Survey <br />$ 9,600 <br />$ 6,400 <br />$ 16,000 <br />Other <br />NA <br />NA <br />NA <br />Division 3 - Concrete <br />Building Concrete Reinforcing <br />$ 220,680 <br />$ 98,000 <br />$ 318,680 <br />Site Concrete Reinforcing <br />INC <br />INC <br />INC <br />Cast In Place Concrete (Building & Site) <br />$ 845,000 <br />$ 335,000 <br />$ 1,180,000 <br />Concrete Topping <br />INC <br />INC <br />INC <br />Other <br />NA <br />NA <br />NA <br />Division 4- Masonry <br />CMU <br />$ 108,300 <br />$ 133,100 <br />$ 241,400 <br />CMU Veneer <br />INC <br />INC <br />INC <br />CMU Reinforcing <br />INC <br />INC <br />INC <br />Precast Wall Cap <br />INC <br />NA <br />INC <br />Division 5 - Metals <br />Structural Steel <br />$ 1,326,166 <br />$ 495,397 <br />$ 1,821,563 <br />Metal Deck <br />$ 102,500 <br />$ 46,948 <br />$ 149,448 <br />Structural Metal Studs (with Framing in Div 9) <br />INC <br />INC <br />INC <br />Metal Fabrications <br />INC <br />INC <br />INC <br />Fences & Gates <br />INC <br />INC <br />INC <br />Division 6 -Wood and Plastics <br />Misc. Rough Carpentry <br />$ 18,950 <br />$ 7,900 <br />$ 26,850 <br />Casework <br />$ 64,500 <br />$ 16,780 <br />$ 81,280 <br />Division 7 - Thermal and Moisture Protection <br />Sheet Waterproofing <br />$ 8,778 <br />$ 14,350 <br />$ 23,128 <br />Thermal Acoustical Insulation <br />$ 17,699 <br />$ 8,662 <br />$ 26,361 <br />Thermoplastic Membrane Roofing <br />$ 131,850 <br />$ 66,000 <br />$ 197,850 <br />Flashing & Sheet Metal <br />$ 53,747 <br />$ 18,102 <br />$ 71,849 <br />Roof Accessories <br />INC <br />INC <br />INC <br />Cementitious Fireproofing <br />INC <br />INC <br />INC <br />Fire stopping /Expansion Joint <br />$ 12,379 <br />$ 21,633 <br />$ 34,012 <br />Division 8 -Doors and <br />Windows <br />Doors /Frames /Hardware <br />$ 91,900 <br />$ 55,000 <br />$ 146,900 <br />Coiling Doors <br />$ 14,000 <br />$ 14,000 <br />$ 28,000 <br />Windows /Glazing <br />$ 77,961 <br />$ 63,751 <br />$ 141,712 <br />Access Doors <br />$ 1,000 <br />$ Soo <br />$ 1,800 <br />Division 9 - Finishes <br />Portland Cement Plaster <br />INC <br />INC <br />INC <br />Gypsum Board Assemblies <br />$ 1,003,000 <br />$ 371,000 <br />$ 1,374,000 <br />Metal Stud Framing <br />INC <br />INC <br />INC <br />Acoustical Ceiling <br />$ 65,000 <br />$ 22,500 <br />$ 87,500 <br />Ceramic Tile <br />$ S1,682 <br />$ 31,260 <br />$ 83,142 <br />Flooring <br />$ 43,675 <br />$ 26,905 <br />$ 70,580 <br />SANTA ANA UNIFIEDSCHOOLDISTRICT - GARFIELDELEINIENTARY SCHOOL BaltarBeaft <br />Construction <br />