Laserfiche WebLink
http: / /www.wdol.gov /wdol /scafi les /davi sbacon/CA3 5.dvb ?v =9 <br />BRICKLAYER; MARBLE SETTER ........ $ 35.26 12.26 <br />*The wage scale for prevailing wage projects performed in <br />Blythe, China lake, Death Valley, Fort Irwin, Twenty -Nine <br />Palms, Needles and 1 -15 corridor (Barstow to the Nevada <br />State Line) will be Three Dollars ($3.00) above the <br />standard San Bernardino /Riverside County hourly wage rate <br />---------------------------------------------------------------- <br />BRCA0018 -004 06/01/2012 <br />Rates Fringes <br />MARBLE FINISHER ..................$ 27.04 10.66 <br />TILE FINISHER ....................$ 22.37 9.19 <br />TILE LAYER .......................$ 33.55 13.55 <br />---------------------------------------------------------------- <br />BRCA0018 -010 09/01/2009 <br />Rates Fringes <br />TERRAZZO FINISHER ................$ 26.59 9.62 <br />TERRAZZO WORKER/SETTER ........... $ 33.63 10.46 <br />---------------------------------------------------------------- <br />CARP0409 -001 07/01/2010 <br />Rates Fringes <br />CARPENTER <br />(1) Carpenter, Cabinet <br />Installer, Insulation <br />Installer, Hardwood Floor <br />Worker and acoustical <br />installer, and solar panels.$ <br />37.35 <br />11.08 <br />(2) Millwright ..............$ <br />37.85 <br />11.08 <br />(3) Piledriver /Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................$ <br />37.48 <br />10.58 <br />(3) Piledrivermen /Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................$ <br />37.48 <br />11.08 <br />(4) Pneumatic Nailer, <br />Power Stapler ...............$ <br />37.60 <br />11.08 <br />(5) Sawfiler ...............$ <br />37.44 <br />11.08 <br />(6) Scaffold Builder ....... <br />$ 28.55 <br />11.08 <br />(7) Table Power Saw <br />Operator ....................$ <br />37.45 <br />11.08 <br />FOOTNOTE: Work of forming in the construction of open cut <br />sewers or storm drains, on operations in which horizontal <br />lagging is used in conjunction with steel H -Beams driven or <br />placed in pre- drilled holes, for that portion of a lagged <br />trench against which concrete is poured, namely, as a <br />substitute for back forms (which work is performed by <br />piledrivers): $0.13 per hour additional. Certified Welder <br />- $1.00 per hour premium. <br />CARP0409 -005 07/01/2010 <br />8/28/2012 10:39 AM <br />