My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (2) -2012
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (2) -2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 11:26:15 AM
Creation date
1/23/2013 9:08:48 AM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2012-188
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
9/4/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
http://www.wdol.gov/wdol/scafiles/davisbacon/CA35.dvb?v=9 <br />GROUP 2: Chucktender, cabletender; Loading and unloading <br />agitator cars; Nipper; Pot tender, using mastic or other <br />materials (for example, but not by way of limitation, <br />shotcrete, etc.); Vibrator person, jack hammer, pneumatic <br />tools (except driller) <br />GROUP 3: Blaster, driller, powder person; Chemical grout jet <br />person; Cherry picker person; Grout gun person; Grout mixer <br />person; Grout pump person; Jackleg miner; Jumbo person; <br />Kemper and other pneumatic concrete placer operator; Miner, <br />tunnel (hand or machine); Nozzle person; Operating of <br />troweling and /or grouting machines; Powder person (primer <br />house); Primer person; Sandblaster; Shotcrete person; Steel <br />form raiser and setter; Timber person, retimber person, <br />wood or steel; Tunnel Concrete finisher <br />GROUP 4: Diamond driller; Sandblaster; Shaft and raise work <br />GUNITE LABORER CLASSIFICATIONS <br />GROUP 1: Rodmen, Nozzlemen <br />GROUP 2: Gunmen <br />GROUP 3: Reboundmen <br />---------------------------------------------------------------- <br />LAB00300 -005 08/05/2009 <br />Rates Fringes <br />LABORER <br />PLASTER CLEAN -UP LABORER .... $ 26.65 15.95 <br />PLASTER TENDER ..............$ 29.20 15.95 <br />---------------------------------------------------------------- <br />LAB00882 -002 01/01/2010 <br />Rates Fringes <br />Asbestos Removal Laborer ......... $ 26.15 11.65 <br />SCOPE OF WORK: Includes site mobilization, initial site <br />cleanup, site preparation, removal of asbestos - containing <br />material and toxic waste, encapsulation, enclosure and <br />disposal of asbestos- containing materials and toxic waste <br />by hand or with equipment or machinery; scaffolding, <br />fabrication of temporary wooden barriers and assembly of <br />decontamination stations. <br />LABO1184 -001 0710112011 <br />Rates Fringes <br />Laborers: (HORIZONTAL <br />DIRECTIONAL DRILLING) <br />(1) Drilling Crew Laborer ... <br />$ 28.01 <br />11.48 <br />(2) Vehicle Operator /Hauler.$ <br />28.18 <br />11.48 <br />(3) Horizontal Directional <br />Drill Operator ..............$ <br />30.03 <br />11.48 <br />(4) Electronic Tracking <br />Locator .....................$ <br />32.03 <br />11.48 <br />Laborers: (STRIPING /SLURRY <br />SEAL) <br />GROUP 1 .....................$ <br />28.50 <br />14.56 <br />GROUP 2 .....................$ <br />29.80 <br />14.56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.